The rate for one man to finish a 2mx2mx2m whole is...
1 man = 8m3 per day
At the same rate three men can each do a 2mx2mx2m whole. This is how much they altogether can do in one day.
3 men = 24m3 per day
The whole they have to dig is this size.
4mx4mx4m which is 64m3
Since three men can do 24m3 per day it will take them 2 days and 16 hours to dig a 64m3 hole.
normal working time divided by total working time.
The answer will depend on the drip rate. The drip rate will depend on the viscocity of the fluid which is not known.The answer will depend on the drip rate. The drip rate will depend on the viscocity of the fluid which is not known.The answer will depend on the drip rate. The drip rate will depend on the viscocity of the fluid which is not known.The answer will depend on the drip rate. The drip rate will depend on the viscocity of the fluid which is not known.
Assuming they can work in parallel, the answer should be 5. 5 men produce 1 hole per hour in the first example. At that rate, they produce 5 holes in 5 hours. The same 5 men, working at one hole per hour, should be able to produce 100 holes in 100 hours (assuming they don't need sleep, etc.)
Before you start to dig a hole in ground, you need to have proper knwoledge about the ground soil to avoid it from caving in and getting yourself trapped in there. On an average a good labourer would take 3-5 hours to dig a five feet deep hole.
You can find out the conversion rate then weigh yourself using a regular weighing scale then work out how much it is with your conversion rate. You can find out the rate online.
15 miles per hour
The rate of chemical reactions is how long a chemical reaction takes to finish.
2 hours. Because is it takes him 1 hour to dig a hole half the size of what hes going to dig then u have to add another hour to dig 2 more meters long 2 more meters wide and 2 more meters deep.
seven days.
it takes about 3 weeks with a 3 week rate
Awesome!
It takes about 5-6 weeks for the package to get there.
Usually takes 3 to 5 days depending on rate of metabolism.
it takes 6-8 weeks for a cannabis plant to grow
It takes years of arrives never......
Rather obviously, it is called doubling time.
Doubling population rate is however long it takes for a country's population to double - but calculation wise I THINK (not sure) [ (Immigration rate - emigration rate) + (Birth rate - death rate) ]check around site for a confirmation of the formula