The answer is 49.
Nope, it's 49.
both are divisible by seven. 42/49 = 6/7
-49 A negative times a positive is always a negative.
there are 49 days in seven weeks: seven days in a week and seven weeks - 7 x 7.
400 + 48 + 49 = 497 (four hundred ninety-seven).
It is 49/64.
seven times seven equals 49 ..
(-2/7) / (-4/49) = (-2/7) * (-49/4) = 98/28 = 3.5
A week consists of seven days. Therefore it would be seven times seven (7x7 = 49) which equals 49. So there are 49 days in seven weeks.
49, square of seven
seven 7² = 49
49! :D
49
Seven 49 = 7 x 7
49
49 = Seven Times Seven