7 for 28.
c = 2a then c + 9 + a + 9 = 3c 2a + a + 9 + 9 = 6a 3a = 18 On Monday Carlos worked 12 hrs, Alan worked 6; on Tuesday each worked 9 hours giving totals for Carlos 21 and Alan 15, ie 36 overall which is 3 times Carlos' Monday shift.
4 4/5 hours
542.50
12 hours.
5.91666... what in hours? 5.91666... = 5 + 91/100 + 6/900 = 511/12 So, depending upon what the 511/12 are: 511/12 seconds in hours is 511/12 ÷ 3600 hours = 71/43200 hours ≈ 0.0016 hours 511/12 minutes in hours is 511/12 ÷ 60 hours = 71/7200 hours ≈ 0.0986 hours 511/12 hours in hours is 511/12 hours = 5.917 hours 511/12 days in hours is 511/12 x 24 hours = 142 hours 511/12 months in hours is 511/12 x 182 hours = 10765/6 hours ≈ 1076.83 hours 511/12 miles at 10 mph is 511/12 ÷ 10 hours = 71/120 hours ≈ 0.592 hours 511/12 miles at 20 mph is 511/12 ÷ 20 hours = 71/240 hours ≈ 0.296 hours 511/12 miles at 60 mph is 511/12 ÷ 60 hours = 71/720 hours ≈ 0.0986 hours You need to specify what the 5.91666... units are then you will get the answer you require.
12-14 hours
If you worked 4 out of 12 hours, then 8 out of 12 hours are left or 8/12 of the shift which is the same as 2/3 of the shift.
12 hours
Men worked for 16 hours a day in the factories Women worked for 12 hours and no child under the age of 9 was allowed to work more than 9 hours
They worked in mills, factories, or cotton mills. They worked for about 12-18 hours a day.(:
The hours the pyramid builders worked were governed by daylight. It is most likely they worked between 10 and 12 hours a day.
they worked very long hours approx. 12 - 16 hours a day
In staten island, NY, they can be worked up to 12 hours a day.
I have worked eight, ten and twelve hour shifts. Shifts are longer as needed, but seldom are shorter than eight hours.
how many hours is child labor Children worked 6 days a week for 12 to 14 hours a day.
If each piper played for 2.5 hours per shift and worked continuously for 12 days, first, we need to determine the total hours worked in that period. There are 12 days, and assuming they worked 24 hours each day, that totals 288 hours (12 days x 24 hours). If each piper played for 2.5 hours per shift, then each piper played a total of 288 hours / 2.5 hours per shift = 115.2 shifts. Thus, if they played continuously, they would have played for 288 hours over the 12 days.
$.75