Yes because 6 times 7 = 42 days
7 x 6 = 42 (the answer is yes).
42 weeks and 6 days.
42 days. 7 days x 6 weeks = 42 days.
6 as 7 days in a week so 42/7=6
In 1 week there are 7 days, so in 6 weeks there would be 42 days.
6x7=42
42 weeks and 6 days.
1 week = 7 days6 weeks = (6 x 7) = 42 days
42 days. 7 days x 6 weeks = 42 days.
42 days
Six weeks is 42 days (6X7).
There are 42 days in six weeks, since there are seven days in a week. 7x6=42.
6 as 7 days in a week so 42/7=6
There are 7 days in a week, so 7 days per week x 6 weeks = 42
In 1 week there are 7 days, so in 6 weeks there would be 42 days.
6x7=42
42 (7 days in 1 week x 6)
7 days = 1 week therefore 300 days = 42 weeks 6 days