To make one yard of concrete from 80# bags you will need about 40-45 bags. Each bag is about .67 or 2/3 cubic foot. you will need 27 cubic feet to make 1 cubic yard. Cheaper to have a redimix truck deliver, and a lot less work.

User Avatar

Wiki User

17y ago

What else can I help you with?

Related Questions

120 square feet of concrete at 8 inches thick how many 80 pound bags of concrete will you need?

go to any search. and type in concrete calculater


How thick is the concrete typically used for driveway construction?

The concrete typically used for driveway construction is around 4 inches thick.


How thick should a concrete driveway be to ensure durability and longevity?

A concrete driveway should be at least 4 inches thick to ensure durability and longevity.


How thick is a driveway slab has to be?

Concrete driveways are no less than 3.5 inches to 4.5 inches.


How many 80 pound bags of concrete to pour a 2x2 slab 6 inches thick?

To calculate the number of 80-pound bags of concrete needed for a 2x2 slab that is 6 inches thick, first determine the volume of the slab. The volume is 2 feet x 2 feet x 0.5 feet (6 inches) = 2 cubic feet. An 80-pound bag of concrete typically yields about 0.6 cubic feet. Therefore, you would need approximately 4 bags (2 cubic feet ÷ 0.6 cubic feet per bag = about 3.33 bags, rounded up to 4).


How thick should a concrete slab foundation be?

4 To 6 inches


How tall is a pound coin?

A British pound coin is 22.5 millimetres in diameter (0.89 inches) and is 3.15 millimetres thick (0.124 inches).


What size pad will 10 yards of concrete make at 4 inches thick?

90 sq yds at 4" thick.


How many square feet in a cubic yard of concrete at 4 inches thick?

81


How many square feet will a yard of concrete cover at 2 inches thick?

About 162sf.


24 feet by 16 feet 4 inches thick how much concrete?

55


How thick should gravel be to pour concrete on top?

should be at lest 4 inches