1*4*5 = 20 cubic feet.
1*4*5 = 20 cubic feet.
1*4*5 = 20 cubic feet.
1*4*5 = 20 cubic feet.
1*4*5 = 20 cubic feet.
27 cubic feet = 1 cubic yard4 inches = 1/3 foot(81 square feet) x (1/3 foot) = 27 cubic feet = 1 cubic yard
4 inches = 1/3 foot27 cubic feet = 1 cubic yardVolume = 80 x 1/3 x 1/3 = 88/9 cubic feet = 0.329 cubic yard (rounded)
4x4x3 = 48 cubic feet
27 cubic feet = 1 cubic yard Volume = (length) x (width) x (depth) = 10 x 4 x 1 = 40 cubic feet = 1.48 cubic yards (rounded)
Eight cubic feet (4' x 4' x .5' = 8).
If 1 cubic yard = 27 cubic feet, then 4 cubic yards = 108 cubic feet.
27 cubic feet = 1 cubic yard 54 cubic feet = 2 cubic yards . . 108 cubic feet = 4 cubic yards
12 cubic feet.
24 cubic feet
Convert 3 inches to feet which is 1/4 feet Then volume is 4 x 8 x 1/4 = 8 cubic feet
24' x 40' x 4 inches = 11.85 cubic yards.
1 Imperial gallon = 0.1605 cu ft (to 4 dp) 1 US gallon = 0.133681 cubic feet
Convert everything to cubic feet. It should be easy then. Since one yard = 3 feet, 1 cubic yard = 27 cubic feet; also, one square foot x 1/4 foot = 1/4 cubic foot.
27 cubic feet = 1 cubic yard4 inches = 1/3 foot(81 square feet) x (1/3 foot) = 27 cubic feet = 1 cubic yard
1 "yard" of concrete is really 1 "cubic yard" = 27 cubic feet8 x 8 x 4 = 256 cubic feet = (256/27) = 9.48 cubic yards
4' x 4' x 7' = 112 cubic feet
There are: 4*4*6 = 96 cubic feet