2 ft/1 yard = 2 ft/3 ft = 2/3
2 ft/1 yard = 2 ft/3 ft = 2/3
2 ft/1 yard = 2 ft/3 ft = 2/3
2 ft/1 yard = 2 ft/3 ft = 2/3
2 ft/1 yard = 2 ft/3 ft = 2/3
The answer depends on as a fraction of WHAT!
3
1 yard is 36 inches. Convert .75 to the fraction 3/4 & multiply 36 x 3/4 = 27inches. 27 inches = 2ft 3in.
50 feet.
A ton of 2b limestone is a little less than a cubic yard. A cubic yard is 27 cubic feet. When I calculate 2b limestone I estimate that there are 25 cubic feet per ton. A 2ft by 2ft by 100ft trench is 400 cubic feet. 400/25=16 so I estimate 16 tons of 2b limestone would be required. Your mileage may vary.
2/1 feet.2/1 feet.2/1 feet.2/1 feet.
3 yard 2 feet = 11 feet
A yard equals= 3ft so the answer is 12 1/2FT
Approximately 2ft long.
1/2 yard
2ft long
2/3