500
75/425 = 3/17 = 17.6470588235294%
425 It is 75 more than 350 and 75 less than 500. To find the halfway point, add the two numbers and divide by 2.
It is (453*425)+275 = 192800
There are 24 hours in a day so divide 425 by 24. The answer will show you that 425 hours is a bit more than 17 days.
The percentage decrease is 15%. It can also be expressed as a difference of -15%. 425 - 500 = -75 -75 / 500 = -0.15 -0.15 x 100 = -15 So 15%.
Equal to.
425 is greater than 17
from experience more than you want to with those brakes just take it easy install a trany cooler if automatic otherwise just be careful its easy to get these trucks to pull more than they can stop at todays speeds
88 = 75 + 13
425 is, 4/25 isn't.
What number is 75 more than the difference of 128 and 453?
75 is 100*75/25 % = 300% of 25. So it is 200% more.