30 + 40 = 7070/2 = 35
27 + 35 + 38 = 100 30 + 30 + 40 = 100
27/40 = 135/200 35/50 = 140/200 So the second fraction is bigger
30
30 + 40 + 10 + 40 = 120120/4 = 30Average = 30
35 as in 30 + 40 = 70 then as there are two numbers divide by two, then 70 / 2 = 35 or 30 + 5 = 35 = 40 - 5
30 + 40 = 7070/2 = 35
36
35 the average of 30 and 40. However, 35 rounded to the nearest ten would be 40.
27 + 35 + 38 = 100 30 + 30 + 40 = 100
$27-$35 per hour
The greatest common factor of 30, 35, and 40 is 5. (30/5 = 6), (35/5 = 7), and (40/5 = 8)
30, 35, 40, 45
31
27/40 = 135/200 35/50 = 140/200 So the second fraction is bigger
About 30-35 MPH, possibily 40 MPH for a fast one.
35 40 30 45 34 38 32