According to Building Control Regulations, the DPC should be a minimum of 150mm above external finished ground level.
8.5 + 2.75 = 11.25
John should buy a post that is 10 feet long. This accounts for the 8 feet above ground level and the 2 feet that needs to be buried in the ground.
My contractor suggested I invest in an above ground pool deck rather than the usual. What is the benefit?
8 1/2 = 8.5 + 2 3/4= 2.75 = 11.24 = 11 1/4
lofty means high, so a lofty building is perhaps a building built high above the ground or maybe a skyscraper?
A cellar (or basement) is below the ground level of a house or building.
a structure that is above ground in which a person/ people may live in work in
No, soil pipes should not be laid above ground. Soil pipes should be installed within the building structure and connect to the sewer or septic system underground to ensure proper drainage and sanitation. Above ground installation can lead to leaks, odors, and potential health hazards.
1472 feet
The forks should be 1 foot above ground
Skyscrapers maximize the building footprint on the ground, by providing additional square footage for each floor above the first that essentially duplicates the building's footprint.