This question cannot be answered sensibly. A square foot is a measure of area, with dimensions [L2]. A cubic yard is a measure of volume, with dimensions [L3]. Basic dimensional analysis teaches that you cannot convert between measures with different dimensions such as these without additional information.
It will take 800 cubic yards 1/3 compaction.
There are 548.64 meters in 600 yards.There are 0.9144 metres in one yard. Therefore, 600 yards is equal to 600 x 0.9144 = 548.64 metres.
600 cubic meters equates to 158,503 US gallons.
I assume you mean cubic yards (some of us are really rigorous about our units) 600 ftxft (1/3yards/ft)(1/3yards/ft) = 600 (1/9)yards2 = 66 2/3 yards2 4 inch (1/12 ft/inch) = 1/3 ft 1/3 ft (1/3)yard/ft = 1/9 yards 66.66666666 yards2 x 1/9 yards = 7.41 yards3
3 feet = 1 yard so: 200 feet divided by 3 = 66.66667 yards
600 US gallons = 138,600 cubic inches = 80.208333... cubic feet = 2.9707 cubic yards. (rounded)
It will take 800 cubic yards 1/3 compaction.
For a 4-inch depth you will need 7.41 cubic yards.
600 feet is 200 yards.
200 yards
1,800 feet (600 Yards x 3 feet/yard)
There are 3 feet in one yard. Therefore, 600 feet is equal to 600/3 = 200 yards.200 yards.
it is 600/1760=.340909090909................................
You will need 0.309 cubic yards (about 600 pounds) of gravel.
25 yards is 22.86m. 600/22.86 is 26.25 times
1,036,800
There are 548.64 meters in 600 yards.There are 0.9144 metres in one yard. Therefore, 600 yards is equal to 600 x 0.9144 = 548.64 metres.