15 milligrams
M20 - 6.20bags
For M25 grade concrete, the mix proportion is typically 1:1:2 (cement:sand:aggregate). This means for 1 cubic meter of concrete, you would need 1/4 cubic meter of cement. As 1 cubic meter is equivalent to 35.32 cubic feet, and one bag of cement usually covers around 0.035 cubic meters, you would need approximately 7-8 bags of cement for 1 cubic meter of M25 grade concrete.
7 cement bags per 1 cubic meter of concrete......
For M10 (1:3:6) Grade of concrete cement bag consumed = 4.4 bags/cum M15(1:2:4) Grade of concrete cement bag consumed = 6.6 bag/cum M20(1:1.5:3) Grade of concrete cement bag consumed = 8.2 bag/cum
How much cement sand and stone do you need for 1 cubic meter of concre
According to Blue Circle it takes 108 bags of concrete to get a cubic meter
4.50/bag cement, required for 1 cubic metre of concrete ( M10).
30
M 15 grade proportion - 1:2:4 (cement:FA:CA)Cement required in kgs - 325 kg per cu.mNo. of bags required - 6.50
Cement content varies on concrete type, but is typically 400kg per cubic metre. According to the manufacturer, Portland Cement (which is what 99.9% of all cement actually is) has a density of 1505kg/cubic meter.
300 kilos.