To determine how many 50 kg cement bags are required for 1 cubic meter of Grade 30 concrete, we need to break down the mix ratio and calculate the cement content based on that.
Grade 30 Concrete Mix Ratio
Grade 30 concrete typically has a mix ratio of 1:2:3 (Cement: Sand: Aggregate) by volume. This means:
1 part cement
2 parts sand
3 parts aggregate (gravel)
However, the actual proportion of cement required can vary slightly depending on the specific mix design used by a contractor or engineer. For standard Grade 30 concrete, the cement content is typically around 350 to 400 kg per cubic meter.
Since each cement bag weighs 50 kg, the number of bags required for 1 cubic meter of Grade 30 concrete would be:
Number of bags
= 350 kg / 50 kg
= 7 bags
15 milligrams
M20 - 6.20bags
For M25 grade concrete, the mix proportion is typically 1:1:2 (cement:sand:aggregate). This means for 1 cubic meter of concrete, you would need 1/4 cubic meter of cement. As 1 cubic meter is equivalent to 35.32 cubic feet, and one bag of cement usually covers around 0.035 cubic meters, you would need approximately 7-8 bags of cement for 1 cubic meter of M25 grade concrete.
7 cement bags per 1 cubic meter of concrete......
For M10 (1:3:6) Grade of concrete cement bag consumed = 4.4 bags/cum M15(1:2:4) Grade of concrete cement bag consumed = 6.6 bag/cum M20(1:1.5:3) Grade of concrete cement bag consumed = 8.2 bag/cum
How much cement sand and stone do you need for 1 cubic meter of concre
According to Blue Circle it takes 108 bags of concrete to get a cubic meter
4.50/bag cement, required for 1 cubic metre of concrete ( M10).
30
M 15 grade proportion - 1:2:4 (cement:FA:CA)Cement required in kgs - 325 kg per cu.mNo. of bags required - 6.50
Cement content varies on concrete type, but is typically 400kg per cubic metre. According to the manufacturer, Portland Cement (which is what 99.9% of all cement actually is) has a density of 1505kg/cubic meter.
300 kilos.