Q: How far does the meter box need to be from the electric panel box?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Continue Learning about Electrical Engineering

Can one convert a two prong outlet to a three prong outlet?

Yes, provided that you have a ground wire in the box and that the ground wire is properly connected in the electric panel.


Can you box in an electrical panel in an open room?

That depends on what you mean by "box in". You must always provide access to an electrical panel.


What is a sub panel?

A sub-panel is always fed from a main panel. The main panel is situated where the electrical service wiring first enters the main structure on a dwelling plot or building site.A sub-panel can be situated within the same building as the main panel or it can be in a subsidiary building or structure (such as a garage, garden shed or workshop) that is separate from the main building.More informationA sub-panel is another name for a secondary breaker box, just as "the main panel" is another name for "the main breaker-box"."Breaker-box" and/or "panel" are just alternative short names that are used instead of the full name "circuit breaker box".


Do you need a main disconnect on the feeder wires running to a detached garage running from the box in the house?

Yes you do. The detached garage will either be fed with a single circuit or a sub panel. The wire feeding the garage will need to be protected and that is the purpose of the breaker (disconnect). The breaker size will be determined by the size of the wire that is used on this circuit.


Can you run a 240v wire from the electrical panel then put a junction box to run it where you want?

A 240 volt wire is the insulation factor of the wire. If you mean a 240 supply source from a distribution panel to a junction box then the answer is yes. You have to keep in mind that the box has to be accessible, meaning that you can get to the box to check the splice within the box. Don't bury the junction box behind the wall board.

Related questions

The electric meter for a new house is furnished by the?

The electric meter for a new house is furnished by the power company. The box that holds the meter and anything past the box is the responsibility of the property owner.


Is it dangerous if when you shut off all the breakers on the panel box the meter slowly runs backwards?

Call the Electric Company to observe this. They probably will want to replace the meter. On the other hand I can't think of an easier way to lower your electric bill. But dangerous, I wouldn't think so.


Where the circuit breakers are located?

If your circuit breakers are in the garage, they would be in a electrical panel (a metal box mounted on a (usually) outside wall, with the electric meter on the outside. The circuit breakers can be either just below the meter on the outside on opposite it inside the garage. It would usually be very close to where the electric connection to the house is. The electrical panel and breakers are not necessarily in the garage.


How does one open the electric window control box on the driver side door?

NEED TO TAKE THE WHOLE DOOR PANEL OFF


How do you ground your meter box to your breaker box?

The grounding is done through the metal nipple that connects out of the back of the meter base and into the back of the breaker panel.


What is the wire that runs from the electric meter to the breaker box called?

Service Entrance Conductors.


How long it takes to install a domestic electric meter for a new customer?

In the US, it only takes a couple of minutes for a power company electrician to install an electric meter on a new service. The drop from the power line is made to an electrical connection box in the house, and the box has the meter base built into it. The meter basically "bayonets" into the base, and then is secured. Some kind of a "tamper indicator" is then affixed so that the meter cannot be removed without breaking that indicator. With the panel in place and properly wired and inspected, the power company electrician can have the meter in and buttoned up in just a couple of minutes.


What gauge of cooper service wire for 200A service to meter box and service panel?

bed


What size grounding wire do you use as the 4th wire running in your conduit from your 200 amp meter box to your 200amp service panel this is the ground wire from box to box?

You do not use a ground wire in the connection from the meter base to the distribution panel. A bonding wire may be required if the service is using PVC conduit.


What is the minimum distance allowed between the electric meter box and the liquid petroleum gas regulator?

150mm


Why would your electric meter to house turn slow if you have the main turned off?

If your main breaker is open and the utility meter is still measuring current, you probably have another circuit tapped ahead of the main. Usually there will be some sort of junction box with a breaker or fuse in it that is located close to the main panel and probably connected to the main panel with conduit. If you do not see a junction box in close proximity to the main panel then carefully remove the front cover of the main panel and look for a couple smaller wires that are tightened into the cable side of the main breaker. Either that, or check for a few wires that run out of the panel through the same conduit that runs to the meter. Those would be the two most likely terminations used by somebody (previous owner) trying to add a circuit to a full panel. If you can locate that tap, you should be able to follow the wire to determine what the load is. Although I've never heard of a meter measuring current when there is no load on it, you will need to call the utility company if you cannot find a circuit tapped ahead of the main breaker. They own the meter.


Diagram of fuse box panel for 1985 s10 truck?

I need a diagram of the fuse box panel in a 1985 Chevy s10 pickup. Thank you.