Want this question answered?
1 inch = 0.0254 metres. So 1 cubic inch = (0.0254)3 cubic metres and 144 cubic inch = 144*(0.0254)3 cubic metres = 0.002360 m3
81 Square feet.
123.44 cubic yards
84 cubic inches!
25 sq ft * 5 inch = 25/9 sq yards * 5/36 yards = (25/9)*(5/36) cubic yards = 125/216 cubic yards
2000 to 2500 Kg/cubic meter depending upon the grade of concrete
1 cubic inch = 1.6387064 × 10-5 cubic meters For every cubic inch, multiply it by 0.000016387064 to attain cubic meters.
0.00397 pounds per cubic inch.
ANSWER Volume -> 3.14 * 40 * 40 * 240 = 1 205 760 cubic inch 1 205 760 cubic inch = 19.76 cubic meter
There are approximately 61023.38 CUBIC inches in a cubic meter.
1 kg per cubic meter = 3.6127292 × 10-5 pounds per cubic inch.
1 inch = 0.0254 metres. So 1 cubic inch = (0.0254)3 cubic metres and 144 cubic inch = 144*(0.0254)3 cubic metres = 0.002360 m3
2.1237634944 m cubbed.
For a 4-inch depth: 4.75 cubic yards. For a 6-inch depth: 7.1 cubic yards.
2000 cubic foot = 2000 (cubic foot) x 1728 (cubic inch/cubic foot) x 16.387 (cubic cm/cubic inch)x1/1000000(cubic meter/cubic cm) = 56.6337 cubic meter from the above answer we get: 25 cubic meters = 882.867 cubic foot
for ,this we need to calculate the volume of concrete . volume of concrete = L x B Xh. =17 X 4 X24 . =1632 inch cube. Thus,1632 cubic inches concrete is needed for 17 inch by 24 inch by 4 inch deep .
If you want to know the volume of blockfill for 8 inch blocks its 120 blocks to the cubic metre of concrete