There has to be a pull box between every four quarter bends in a conduit run.
Conduit bodies are used to provide pulling access in a run of conduit, to conserve space where a full size bend radius would be impractical, to allow more bends to be made in a section of conduit or to split a conduit path into multiple directions.
An electrical conduit is commonly installed in several steps. The first step would be to carefully plan the position of the conduit and what materials that are required for the surface. Then one should execute the plan with common tools such as a screwdriver.
The conductors of any three phase circuit must be run in the same conduit. If the circuit requires a neutral, it must also run with the conductors in the same conduit. (If they were to be run in more than one conduit or raceway, the circuit would not operate properly.)
What kind of wire? If it's a power wire, why is the place wired with conduit? Commercial buildings must put all power wiring in conduit, so if you're planning to run romex in a commercial building, the answer would be "no", it's not permissible. If it's data wire, note that there may be some "crossover" interference if the data wire follows a power wire for very much distance. It's usually not a problem to cross a conduit and tie to it, but it's generally recommended that you not tie data cable to conduit.
If the service stack is supported by a support structure and the utility feed drop is not supported from the conduit, the size of the conduit can be 1 1/4". If the service stack is used to support the utility feed drop then the conduit has to be 2" schedule 40 conduit. The reasoning behind this is that if in a storm a tree limb falls across the service drop, the lighter weight conduit could bend and pinch the wires in the stack and short out. This would be ahead of the main service breaker and the only protection for the wire would be the primary fuse at the transformer. Theoretically this amperage could rise to 50000 amps before the primary fuse blows. A schedule 40 service stack if supported, as the code requires, will withstand most tree falls. What is most likely to happen is that the utility connectors will pull apart leaving the service stack intact.
offset bends.
offset bends.
Conduit bodies are used to provide pulling access in a run of conduit, to conserve space where a full size bend radius would be impractical, to allow more bends to be made in a section of conduit or to split a conduit path into multiple directions.
Not normally. An elaboration of what circuits are in the conduit and what type of conduit it is would be useful, though, and necessary to give a definitive answer.
An electrical conduit is commonly installed in several steps. The first step would be to carefully plan the position of the conduit and what materials that are required for the surface. Then one should execute the plan with common tools such as a screwdriver.
Use these numbers when bending offsets: 10 degree bends, multiply the depth of the offset by 6 this will give you the distance between bends. For 20 degree multiply by 2.6, for 30 degree multiply by 2, for 45 degree multiply by 1.4, for 60 degree multiply by 1.2. I use 30 degree bends for all of my offsets, just because its easier to do the math. So your answer would be 24 inches between bends. I have come to the conclusion anybody can bend conduit, its the measuring and marking that requires skill.
Use these numbers when bending offsets: 10 degree bends, multiply the depth of the offset by 6 this will give you the distance between bends. For 20 degree multiply by 2.6, for 30 degree multiply by 2, for 45 degree multiply by 1.4, for 60 degree multiply by 1.2. I use 30 degree bends for all of my offsets, just because its easier to do the math. So your answer would be 24 inches between bends. I have come to the conclusion anybody can bend conduit, its the measuring and marking that requires skill.
Use these numbers when bending offsets: 10 degree bends, multiply the depth of the offset by 6 this will give you the distance between bends. For 20 degree multiply by 2.6, for 30 degree multiply by 2, for 45 degree multiply by 1.4, for 60 degree multiply by 1.2. I use 30 degree bends for all of my offsets, just because its easier to do the math. So your answer would be 24 inches between bends. I have come to the conclusion anybody can bend conduit, its the measuring and marking that requires skill.
It's 12 AWG THHN, 1/2" PVC would be just fine
Well its when your back bends backward a little and the opposite of a arch would be a hollow. Arch-bends backward and a hollow bends forward
The would be False
It is used to connect two pieces of conduit together. Since you did not know the answer, I would call an electrician to work on your project.