1
6.67 cubic yards
1 foot = 1/3 yard(440 x 1/3) = 146 and 2/3 cubic yards
1 cubic yard = 27 cubic feet 1 cubic foot = 0.037 cubic yard (rounded)
1 cubic foot = 0.037 cubic yards
1 foot = 1/3 yards So 1 cubic foot = (1/3)*(1/3)*(1/3) cubic yards = 1/27 cubic yards So 12 cubic feet = 12/27 = 0.44... cubic yards
10 cubic yards for every 1 foot of height.
2 yards
27 cubic feet = 1 cubic yard Volume = (length) x (width) x (depth) = 10 x 4 x 1 = 40 cubic feet = 1.48 cubic yards (rounded)
1 cubic foot equals 0.03704 cubic yards.
A 29 foot by 11 foot by 1 inch depth requires about 1 cubic yard of cement. If the depth is one foot, you will need about 12 cubic yards.
52 cubic yards = 1,404 cubic feet.
An acre is 43,560 square feet. If you have a depth of 1 foot, the volume of dirt in cubic feet is 43,560 cubic feet. Since there are 27 cubic feet in a cubic yard, you would divide 43,560 by 27, resulting in approximately 1,613.33 cubic yards of dirt in an acre that is 1 foot deep.