27 cubic feet = 1 cubic yard
Volume = (length) x (width) x (depth) = 10 x 4 x 1 = 40 cubic feet = 1.48 cubic yards (rounded)
1yd = 3ft, so your garden is 2.667 x 2.667 x 0.333 = 2.37037 cubic yards.
None because it's a hole but 6 cubic yards of dirt will fill it up.
Well, you would take the 7000 square feet of dirt and multiply it by the four inches of stone to get the 28000 cubic yards of stone. (28000 yds³)
2.37 cubic yards.
A yard of dirt is 3ft x 3ft x 3ft, or 27 cubic ft. The hole you need to fill is 8ft x 4ft x 1ft, or 32 cubic ft. You'll need 32/27th yards of dirt, or about 1.19 yards of dirt. Call it a yard and a half if you want to account for settling.
2.37 cubic yards of dirt is needed to fill an 8'X4' that is 24" deep garden box. If the box is filled 12 inches, the amount of soil needed is 1.19 cubic yards and that should be deep enough for most vegetables.
1yd = 3ft, so your garden is 2.667 x 2.667 x 0.333 = 2.37037 cubic yards.
To calculate the volume of dirt needed to fill the area, you would need to know the depth of the area in yards. If the depth is 3 yards, then you would need 1800 yards of dirt (600 cubic yards ÷ 3 yards). If the depth is 1 yard, then you would need 600 yards of dirt.
There are approximately 12 tons in 8 yards of dirt.
14 cubic feet = 0.518 cubic yards
To calculate the volume of the area, multiply the length, width, and height: 120 x 92 x 24 = 331,776 cubic inches. To convert cubic inches to cubic yards (since 1 cubic yard = 46,656 cubic inches), divide 331,776 by 46,656 to get approximately 7.1 cubic yards of dirt needed to fill the area.
1/2
There are 189 cubic feet in 7 yards of dirt. This can be calculated by multiplying the number of cubic yards by 27, since there are 27 cubic feet in a cubic yard.
10-1/2 cubic yards
None because it's a hole but 6 cubic yards of dirt will fill it up.
27 cubic feet = 1 cubic yardVolume = (14-ft x 14-ft x 1-ft) = 196 cubic feet = 7.26 cubic yards (rounded)
Well, you would take the 7000 square feet of dirt and multiply it by the four inches of stone to get the 28000 cubic yards of stone. (28000 yds³)