27 cubic feet = 1 cubic yard
Volume = (length) x (width) x (depth) = 10 x 4 x 1 = 40 cubic feet = 1.48 cubic yards (rounded)
1yd = 3ft, so your garden is 2.667 x 2.667 x 0.333 = 2.37037 cubic yards.
To calculate the volume in cubic yards, first find the volume in cubic inches: (4 \times 8 \times 8 = 256) cubic inches. Next, convert cubic inches to cubic yards by dividing by 46,656 (since there are 46,656 cubic inches in one cubic yard). Thus, (256 \div 46,656 \approx 0.0055) cubic yards of dirt are needed to fill the area.
None because it's a hole but 6 cubic yards of dirt will fill it up.
Well, you would take the 7000 square feet of dirt and multiply it by the four inches of stone to get the 28000 cubic yards of stone. (28000 yds³)
2.37 cubic yards.
2.37 cubic yards of dirt is needed to fill an 8'X4' that is 24" deep garden box. If the box is filled 12 inches, the amount of soil needed is 1.19 cubic yards and that should be deep enough for most vegetables.
1yd = 3ft, so your garden is 2.667 x 2.667 x 0.333 = 2.37037 cubic yards.
To calculate the volume of dirt needed to fill the area, you would need to know the depth of the area in yards. If the depth is 3 yards, then you would need 1800 yards of dirt (600 cubic yards ÷ 3 yards). If the depth is 1 yard, then you would need 600 yards of dirt.
11 cubic yards of planting mix converted to how many tons?
14 cubic feet = 0.518 cubic yards
To calculate the volume of the area, multiply the length, width, and height: 120 x 92 x 24 = 331,776 cubic inches. To convert cubic inches to cubic yards (since 1 cubic yard = 46,656 cubic inches), divide 331,776 by 46,656 to get approximately 7.1 cubic yards of dirt needed to fill the area.
1/2
A yard is 3x3x3 = 27 cubic feet, so 7 yards is 7x27=189 cubic feet
10-1/2 cubic yards
None because it's a hole but 6 cubic yards of dirt will fill it up.
27 cubic feet = 1 cubic yardVolume = (14-ft x 14-ft x 1-ft) = 196 cubic feet = 7.26 cubic yards (rounded)
Well, you would take the 7000 square feet of dirt and multiply it by the four inches of stone to get the 28000 cubic yards of stone. (28000 yds³)