1 square mile = 1760 x 1760 square yards = 3 097 600 sq.yds.
1 inch = 1/36 yard
3 097 600 x 1/36 = 86 044.444 cu.yds.
123.44 cubic yards
1.85 cubic yards.
92.593 cubic yards for every inch deep.
3,495.6 cubic yards.
1 inch = 1/12 foot2 cubic yards = 54 cubic feetVolume = (area) x (depth)54 = A x 1/12A = 54 x 12 = 648 square feet
77/9 cubic yards for every inch of depth.
To calculate the amount of sand needed, first convert the depth from inches to feet. Since 1 inch is 1/12 of a foot, 1 inch deep over 5000 square feet equals 5000 sq ft × (1/12 ft) = 416.67 cubic feet. To convert cubic feet to cubic yards, divide by 27 (since there are 27 cubic feet in a cubic yard): 416.67 cubic feet ÷ 27 = approximately 15.43 cubic yards. Therefore, you would need about 15.43 yards of sand to cover 5000 square feet to a depth of 1 inch.
62/3 cubic yards for every 1-foot deep. 5 cubic yards for every 9-inches deep. 31/3 cubic yards for every 6-inches deep. 5/9 cubic yard for every 1-inch deep.
It depends on how deep the concrete. 600 sq ft at 6 inch deep is 300 cu ft = 11.1 yards. 12 inch deep is 22,2 yards; 4 inch deep is 5.5 yards
25 sq ft * 5 inch = 25/9 sq yards * 5/36 yards = (25/9)*(5/36) cubic yards = 125/216 cubic yards
1 acre = 43,560 square feet1 cubic yard = 27 cubic feet1 inch = 1/12 foot1 acre x 1 inch = (43,560 x 1/12) = 3,630 cubic feet = (3,630 / 27) = 134 and 4/9ths cubic yards
For a 4-inch depth you need at least 14.81 cubic yards.