answersLogoWhite

0


Best Answer

The NEC makes no provision for using 1 ground rod even on a temporary service. According to the NEC you must use 2 ground rods. However in my area we are allowed by the local inspector to use just 1. Call your local inspector and see what he requires as he has the last word on this.

User Avatar

Wiki User

6y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: How many ground rods needed for a temporary service at construction site?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What size ground wire is needed for 200amp service pannel in Chicago?

200 amp service in chicago uses 3 aught.


What does a construction trailer get used for?

A construction trailer can be used as building site offices and/or staff rooms. But also can be used as temporary Classrooms in schools if there is substantial work needed to be doing in a school, to save too much obstruction for the children.


What experience is needed for Construction Project Managers?

As a construction project manager, they need to have a Bachelors degree in engineering or business administration. Strong communication and customer service skills is a must for this position.


What size ground wire needed for a 200amp service panel in new jersey?

#6 bare copper wire.


What roof construction is no ridgeboard needed?

Truss


What qualifications are needed to be a site manager in construction?

gcse


Skills needed for a construction worker?

you need to be strong


How do you prepone air tickets?

To prepone air tickets one must contact customer service to request their needed service. They must also include why this service is needed and when it is needed.


What construction level is needed to put a telescope in your house in Runescape?

Level 44 Construction for normal wooden telescope.


What chemicals are needed for a 20x48 above ground pool?

what chemicals are needed for starting up a 20x48 intex above ground pool


How many grounding rods are needed for 200 amp service?

It depends on where the sub panel is situated. If the panel is under the same roof as the main distribution panel then no ground rods are needed on the sub panel. If the sub panel is in a different building then a ground rod might be needed. There has been an electrical code rule change on this subject. Check with your local electrical inspector before installation so that it is done correctly.


How did the people acquire the materials needed for construction?

They used local materials