the answer is about 1.18 short tons. the answer is about 1.18 short tons.
One cubic yard of broken limestone weighs about 1.3 tons. One cubic yard of pulverized limestone weighs about 1.17 tons.
1.6 tons
A ton of 2b limestone is a little less than a cubic yard. A cubic yard is 27 cubic feet. When I calculate 2b limestone I estimate that there are 25 cubic feet per ton. A 2ft by 2ft by 100ft trench is 400 cubic feet. 400/25=16 so I estimate 16 tons of 2b limestone would be required. Your mileage may vary.
I do not deal in metric tonnes, but maybe the following will help. We use 25 short tons (2000 lbs per ton) is equal to 19 cubic yards.
2.2 tons
grams per milliliter pounds per cubic inch tons per cubic yard lots of others
Tons of WHAT. -That is VITAL information for an answer.
a cubic metere of what? it depends on the density
There is no such thing as a "cubic ton". You can have cubic meters, but not cubic tons.
60,000 cubic feet of dry sand weighs approximately 3000 tons.
2.2 tons.