6 inches = 1/2 foot
Volume = (surface area) x (depth) = 450 x 1/2 = 225 cubic feet = 81/3 cubic yards.
One yard of concrete will cover approximately 90 square feet at a depth of 3-1/2". At an even 3-1/2", you will need just over 3 yards. This does not allow for any footings, turndowns, or a thicker slab.
16 x 16. Actually if you do the math, you could do a 18 x 18, but you never get 4 yards and you rarely get a form that is a perfect .33 feet.
5x8=40sq.inches 12x20=2880. sq. inches divide 2880 divided by 40 = 72 pavers
5 inches is 5/12 feet. So volume of concrete required is 490 x 5/12 = 204.16 cubic feet There are 3 x 3 x 3 = 27 cubic feet in a cubic yard. Therefore the volume required is 204/27 = 7.56 cubic yards (say 8 cubic yards). A useful example of estimating foundations and floor is at `Estimating - Foundation and Floor' http://www.inquirewithin.biz/Vol2/Estimating/estimating_foundations.htm
66
To determine how many patio stones are needed, first convert the dimensions of one stone from inches to square feet. A 24-inch by 24-inch stone is 2 feet by 2 feet, giving it an area of 4 square feet. Dividing the total patio area of 480 square feet by the area of one stone (4 square feet) results in 120 stones needed for the patio.
54
To calculate the area of the patio in square inches, we first convert the dimensions to inches (12 ft = 144 in, 14 ft = 168 in). The patio's area is therefore 24,192 square inches. Each 8-inch paving stone covers 64 square inches, so divide the total area by 64 to find that you'll need 378 paving stones to pave the patio.
The average installation price of a concrete patio per square foot in OK is close to $4. This amount would include everything.
Thickness? Do you mean cement or concrete - cement is the binder/adhesive in the concrete.
144
81 pavers (each 16 inches square) would be needed. 12 foot x 12 foot = 144 inches x 144 inches = 20,736 in2 16 inches x 16 inches = 256 in2 20,736/256 = 81
To calculate the volume of concrete needed to cover the patio, multiply the length, width, and height of the patio together: 6' x 8' x 6' = 288 cubic feet. Since 1 cubic yard is equivalent to 27 cubic feet, divide 288 by 27 to get 10.67 cubic yards of concrete needed to cover the patio. It is advisable to round up to the nearest whole number and account for some extra concrete for any discrepancies or spillage during the pouring process.
need quote on installed concrete patio
To effectively level a concrete patio, you can use a self-leveling compound or a concrete grinder to even out any uneven surfaces. Make sure to follow the manufacturer's instructions carefully and consider seeking professional help if needed.
Our patio needs replacing. How difficult is it to construct a patio ourselves with concrete pavers?
To determine the amount of decking square feet needed for the outdoor patio renovation project, measure the length and width of the patio area in feet and multiply the two dimensions together to calculate the total square footage required.