The variances are squared so that all deviations above and below the mean become positive values. Taking the square root of the variance then gives a measure of the differences from the mean: the standard deviaton. Squaring the deviations also makes the bigger differences stand out. Look at 100 squared vs 10 squared.
Squared
equal variances
calculation of the area of a square
No. "x" is the variable. Any calculation involving a variable would be an EXPRESSION.
total master-budget variances
should all variances be investigated
Ralph only likes squares of numbers. He likes 25 (5 squared), 400 (20 squared), and 144 (12 squared).
To find 1.5 squared, you would multiply 1.5 by itself. This calculation would result in 2.25. This is because 1.5 multiplied by 1.5 equals 2.25. So, 1.5 squared is equal to 2.25.
An F-test can be used for variances.
Adverse variances means unfavourable variance which is actual expenses are more than budgted variance.
Square feet x .093 = square meters. So, 2000 x .093 = about 186 square meters.