answersLogoWhite

0


Best Answer

the structure chart differs from flow chart in these principle ways:

1- It is difficult to identify different modules

of the software from its flow chart representation.

2- Data interchange among different modules is not represented in a flow chart.

3- sequential ordering of tasks inherited in a flow chart is suppressed in structure chart.

User Avatar

Wiki User

14y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: What is the basic difference between structured chart and flow chart?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What is the basic Difference between flow chart and pseudo-code?

what's the difference between flow chart and structure diagrams and pseudo code


Difference between flow chart and structure chart?

Structure chart shows the manageable levels. This chart is used in structured programming to arranged program modules in a tree structure. Flow chart can be used to document in any type of business system, from the movement of materials through machinery. It shows the flow of applicant information through the hiring process in a human resources department.


What is the difference between a pie chart and a donut chart?

A donut chart is the same as a pie chart, except the graphic has a hole in the middle.


Difference between flow chart and model?

A flow chart is a type of model, but not every model is a flow-chart.


What is the difference between organisational chart and Structure?

"What_is_the_difference_between_organisational_chart_and_Structure"


Difference between bar chart and bar graph?

Nothing


What is the difference between a weather map and a synoptic chart?

ks


What is the difference between chart and gragh?

Some charts are graphs.


What is the difference between a bar chart and a radar chart?

I don't believe radar charts are used in mathematics.


What's the difference between the column chart and bar chart?

They are almost same except directions, column chart are vertical type and bar chart are are horizontal.


Your basic pay is 4200rswhat will your total pay after 6commission report?

my basic salary is between 4000-6000. plz send me full chart of my increased salary chart(t.a. d.a. etc)


What is the difference between incomplete and delinquent chart?

a incomplete chart is a chart that is missing patient information and a delinquent chart is a chart that has been signed off on by a physician but is not complete and is missing documents and patient information.