answersLogoWhite

0

The required height for a concrete service entrance at 34.5 kV typically depends on local codes and regulations, but generally, it should be at least 12 feet to accommodate vehicle access and ensure safety. Additionally, clearance requirements may vary based on the presence of overhead power lines and other structures. Always consult local building codes and utility guidelines for specific requirements.

User Avatar

AnswerBot

2w ago

What else can I help you with?

Continue Learning about Math & Arithmetic

How much work is required to lift a 3.1 kg concrete block to a height of 1.6 m?

48.6


How much work is required to lift a 5.4 kg concrete block to a height of 1.8 m?

To calculate the work required to lift a 5.4 kg concrete block to a height of 1.8 m, we use the formula for gravitational potential energy: ( W = mgh ), where ( m ) is the mass (5.4 kg), ( g ) is the acceleration due to gravity (approximately 9.81 m/s²), and ( h ) is the height (1.8 m). Plugging in the values, we get ( W = 5.4 , \text{kg} \times 9.81 , \text{m/s}² \times 1.8 , \text{m} ), which calculates to approximately 95.3 joules. Therefore, about 95.3 joules of work is required to lift the block.


How much work is required to lift a 3.2kg concrete block to a height of 2.7 m?

The work required to lift an object can be calculated using the formula ( W = mgh ), where ( W ) is the work, ( m ) is the mass, ( g ) is the acceleration due to gravity (approximately ( 9.81 , \text{m/s}^2 )), and ( h ) is the height. For a 3.2 kg concrete block lifted to a height of 2.7 m, the work done is ( W = 3.2 , \text{kg} \times 9.81 , \text{m/s}^2 \times 2.7 , \text{m} ), which equals approximately 84.5 joules.


What is the formula to calculate a cylinder of concrete?

To calculate the volume of a cylinder of concrete, you can use the formula: ( V = \pi r^2 h ), where ( V ) is the volume, ( r ) is the radius of the base, and ( h ) is the height of the cylinder. Ensure that the radius and height are in the same units to obtain the volume in cubic units. If you need the weight of the concrete, multiply the volume by the density of concrete, typically around 2,400 kg/m³.


How can we calculate quantity of concrete in column?

Get the summation of the AREA of all columns and multiply with the effective height.

Related Questions

What are required slump height of M20 for different concrete structure?

Required slump height of M20 for different concrete structures, are normally calculated by the required slump value, which would come out to be 100 lits.


What is the minimum height required for ssb entrance exam?

loda le le


Do you have to be a certain height to be a sniper rifle man?

Min height required to join the branch of service.


How much work is required to lift a 3.1 kg concrete block to a height of 1.6 m?

48.6


What are required slump height for different concrete structure?

M25 = 80 to 110mm in slab & beam M30 = 80 to 120mm in column


What is the height of an average gate?

outdoor main gate entrance height


How do you determine height of toilet flanges and floor drains prior to the concrete being puored?

By strict calculations OR install the pipe longer then needed and after the finish work cut the pipe to the required height and install the flange


At what height does water become concrete?

Water does not become concrete at any height. Concrete is a solid material made from a mixture of cement, water, and aggregates like sand and gravel.


At what height does water solidify into concrete?

Water does not solidify into concrete at any specific height. Concrete is a mixture of cement, water, and aggregates that hardens through a chemical process called hydration.


What are the dimensions of a school entrance?

length, width, height


What is the height required for female for being a pilot?

What height is required for a female pilot?


What is the required height for an IPS officer?

the required height is 5 feet 8 inches