48.6
Get the summation of the AREA of all columns and multiply with the effective height.
The answer depends on the height of what? The method required for a person, a building, a mountain peak, a cloud would be different.
The area of that slab is (60 x 20) = 1,200 square feet = 1331/3 square yards.But that doesn't tell you how much concrete you'll need in order to pour it.What you really want to know is the cubic yards of volume required. That'swhat the concrete guys are talking about when thery say "yards" of concrete.1 cubic yard = 27 cubic feetVolume = (length) x (width) x (height) = (60 x 20 x 1/2) = 600 cubic feet = 222/9 cubic yards.( 22.22222... )
Different police agencies have different entrance requirements, but for most, yes, it is. rule for most is height proportional to weight.
Required slump height of M20 for different concrete structures, are normally calculated by the required slump value, which would come out to be 100 lits.
loda le le
Min height required to join the branch of service.
48.6
M25 = 80 to 110mm in slab & beam M30 = 80 to 120mm in column
outdoor main gate entrance height
By strict calculations OR install the pipe longer then needed and after the finish work cut the pipe to the required height and install the flange
length, width, height
What height is required for a female pilot?
the required height is 5 feet 8 inches
yes
The noun height is an abstract noun as a word for the ideal example of something, such as the height of fashion, the height of integrity, the height of absurdity, etc.The noun height is a concrete noun as a word for something physical that can be measured, such as the height of a person, the height of a building, the height of an airplane, etc.