The variance is: 6.0
sum of scores: 24 mean of scores : 24/4 = 6 squared deviations from the mean: 9, 4,4,9 sum of these: 26 sample variance: 26/4 = 6.5
2.12.12.12.1
The variance of 2 6 1 4 2 2 4 3 2 = 2.3611
There are 7 variances associated with a budget ( which are generally calculated for controlling purposes) 1- Material Price variance 2- Material Quantity variance 3- Labor rate variance 4- Labor efficiency variance 5- Spending variance 6- Efficiency variance 7- Capacity variance
The variance is 10.
The variance is: 3.8
Square the standard deviation to obtain the variance. The variance is 62 or 36.
Argentina 6-3 Mexico
6 and four fifth subtract by 3 and one fourth = 3
26.66666667
The score is recalculated over the back 9, then the back 6 then the back 3
four thirds plus 6 = 71/3