How thick? Gotta have thickness to calculate cubic yards.
8 square yards
40.1 cubic yards
how may yards of concrete are needed for a floor 24 x 25 feet?
123.44 cubic yards
For 576 square feet at a depth of 4 inches, you will need 7.11 cubic yards.
To calculate the amount of concrete needed for a project, you need to determine the volume of the area to be filled with concrete. This can be done by multiplying the length, width, and height of the area. Once you have the volume, you can then calculate the amount of concrete needed by dividing the volume by the coverage area of one cubic yard of concrete. This will give you the total number of cubic yards of concrete needed for the project.
90
For a 4-inch depth you will need 7.41 cubic yards.
To calculate the amount of concrete needed for a 900 square foot area, you first need to determine the thickness of the concrete slab. Once you have the thickness in inches, divide it by 36 to convert to yards. Then divide the total cubic yards by the number of cubic yards in a concrete truck to determine how many truckloads you need.
Length in ft x Width in ft. x depth in ft. = Cubic feet, divide by 27 to get yards of concrete needed.
The term "yards" of concrete means cubic yards.
1000 square feet/9 = 111.1 square yards of concrete 6 inches thick. This is the same as 111.1/4.5 = 24.7 cubic yards of concrete.