I think you mean "How much area will 4 yards of concrete cover?". It depends on the slab thickness and whether or not anything significant is embedded (a lot of rebar, conduit, etc.). If working in feet, measure the width length and depth, multiply these numbers then divide the result by 27 to calculate the volume in cubic yards. A slab 9' 6" by 10' 4" by 6" thick translates to 9.5x10.3x.5 (48.93) /27 = 1.8 yards. Since you already have the volume, you will need to play with some of the dimensions to find something that works.
39.1116 cubic yards
50/3 cubic yds of concrete
One square yard is nine square feet, so 27 square feet is equivalent to 3 square yards. So 3 yards of concrete will cover 27 square feet.
20 feet x 20 ft x .3333 ft = 133.33 cubic feet / 27 cubic feet per yard = 4.94 cubic yards
3.16 Cubic Yards
39.1116 cubic yards
8.25 cubic yards of concrete
50/3 cubic yds of concrete
16 * 20 = 320 sq ft. at 4" thick concrete will cover 80 sq ft. 320 / 80 = 4 yards.
One square yard is nine square feet, so 27 square feet is equivalent to 3 square yards. So 3 yards of concrete will cover 27 square feet.
20 feet x 20 ft x .3333 ft = 133.33 cubic feet / 27 cubic feet per yard = 4.94 cubic yards
about 26.4 is the volume i think.......
To my knowledge, concrete is measured in cubic yards. you would convert your measurements to yards 2000 sq ft is about 222.22 sq yards 4 inches is about 0.11 yards multiply to get volume, about 24.7 cu yards
I assume you mean 24 yards, 32 yards and 4 yards. 24 yrd. * 32 yrd. * 4 yrd. = 772 cubic yards of concrete =====================
Depends on how thick it is. At 4 inches thick, you would nee about 5.5 cubic yards adjusting for safety. At 6 inches, you'd need about 8 cubic yards. You can play with different thicknesses with the linked concrete pad calculator.
3.16 Cubic Yards
To find out how many yards of concrete you need for your 450 sq ft patio, you would first need to determine the thickness of the concrete you plan to pour. Let's assume a standard 4-inch thickness. One cubic yard of concrete would cover 81 square feet at a 4-inch depth. So for a 450 sq ft patio at 4 inches thick, you would need approximately 5.56 cubic yards of concrete.