There are 46.67 cubic yards in 1260 cubic feet. You can convert cubic feet to cubic yards by dividing the cubic feet by 27, as there are 27 cubic feet in a cubic yard.
26 cubic yards = 702 cubic feet
797 cu yards = 797 * 33 cu feet = 21519 cu ft.
To convert square feet to cubic yards, you need to multiply by the height. Since the height is given in inches, you first need to convert it to feet (4 inches = 0.33 feet). Then, you can calculate: 460 sq ft * 0.33 ft = 151.8 cubic feet. Finally, you can convert cubic feet to cubic yards (1 cubic yard = 27 cubic feet), so 151.8 cubic feet / 27 = 5.62 cubic yards in 460 square feet at 4 inches thick.
1 cubic yard = 27 cubic feet = 46656 cubic inches 40 cubic yards x 46656 cubic inches per cubic yard = 1,866,240 cubic inches
14.62 cu yds
I cu yd = 27 cu ft you cannot get square feet from cubic yards as square feet is area and yards volume - you need to know how deep the 400 sq feet is - in other words, volume. For example 400 sq feet that is 1 feet deep is 400 cubic feet; then divide by 27 to get cubic yards
There are 5,184 cubic feet in 192 cubic yards. This can be calculated by multiplying the number of cubic yards (192) by 27 (since there are 27 cubic feet in a cubic yard).
27 cu. ft. = 1 cu. yd.
Volume of pit = 9ft * 30ft * 2ft = 540 cubic ft = 540/27 cu yards = 20 cu yards.
You can convert from feet to inches, or from cubic feet to cubic inches, but you can't convert from cubic feet to inches.
You can convert between feet and inches, or between cubic feet and cubic inches. You can not convert between cubic feet and inches.