1:6 brick work sand consumption for 1 cubic meter = 9.71 cft 1 cubic meter brick work cement consumption = 1.32 bags 1.32/28.8= .0458 cubic meter .458*6 = .275 .275*35.31 =9.71 cft
Measure the average length, breadth and width of a brick. Calculate the volume of the brick as L*B*W cubic units Divide 1 by the volume of each brick, with appropriate adjustment for measurement units.
multiplyL xW x H to find the volume of 1 brick. Each measurement should be in cm. 1 cubic meter = (100 cm)3 = 1,000,000 cm3 now divide the volume of 1 brick INTO 1,000,000 that gives the number of bricks.
if tank hight is 7mtr and dia is 8mtrs how i will calculate in cubic meter
It depends on the size of the bricks.
Multiply by a million.
cubic meter
So you get the volume of one brick. Measure the length, width and height of one brick. Convert each to metres (/100 is you measured in centimetres). Now divide a cubic metre by the volume of 1 brick to get how many bricks would make a completely filled in cubic metre. Keep in mind, this method does not count any cement needed to secure the bricks
500 bricks
The weight of 1 cubic meter of red brick work can vary depending on the density of the bricks used. On average, a red clay brick weighs about 150 lbs per cubic foot, which is roughly 2400 kg per cubic meter. However, it's always best to check with the specific manufacturer or supplier for the exact weight of the bricks being used in the construction.
your a nob.
1.25 m3