1 cubic yard = 3*3*3 = 27 cubic feet 27 cubic feet spread to a thickness of 7/12 feet gives = 27/ (7/12) = 27*12/7 = 46.2857 sq feet (to 4 dp)
1 yard = 36 inches 12 cubic yards = 12 x 36 x 36 x 36 cubic inches
First, make sure you're using the right units of measurement. "Yards" measure length, while "cubic feet" measure volume. I think you mean cubic yards. In this case, you first need to figure out how many cubic feet are in a cubic yard. Just like there are 3 feet in one yard, there are 9 square feet in 1 square yard (3^2 feet = 1^2 yards). So, there are 27 cubic feet in 1 cubic yard (3^3 feet = 1^3 yards). Since you are looking for cubic yards in 12 cubic feet, and 12 is less than 27, you can see that the number of cubic yards will be less than 1. Specifically, it will be the fraction 12/27 cubic yards, which reduces to 4/9 cubic yards.
Volume = 12 cubic feet = (12 / 27 ) 0.444 cubic yard
The front yard's volume would be 240 cubic feet. This is calculated by multiplying the length (12 feet) by the width (20 feet) by the depth (1 foot).
1 cubic yard = 27 cubic feet12 x 12 x 2 = 288 cubic feet = 102/3 cubic yards
12*15*.33333= 60 cubic feet. 60 cubic feet/27 cubic feet per cubic yard = 2.222 cubic yards
1 foot = 12 inches1 yard = 3 feet Answer = (2700 x 3/12) cubic feet = 675 cubic feet = 675/36 cubic yards
There are: 120*45*12 = 64800 cubic feet
There are 9 square yards in a cubic yard at a thickness of 3 inches. This is because there are 9 square feet in a square yard and 36 cubic feet in a cubic yard, so the area is 9 square yards if the thickness is 3 inches.
12 cubic meters = 423.78 cubic feet.
10' X 11' X 3" X (1'/12") = 27.5 cubic feet 27.5 cubic feet X (1 cubic yard / 27 cubic feet) = 1.02 cubic yards