1 yard = 36 inches, so 3 inches thick will be 1/12 yard thick. So the area covered will be 12 square yards.
To convert square feet to cubic yards, you need to multiply by the height. Since the height is given in inches, you first need to convert it to feet (4 inches = 0.33 feet). Then, you can calculate: 460 sq ft * 0.33 ft = 151.8 cubic feet. Finally, you can convert cubic feet to cubic yards (1 cubic yard = 27 cubic feet), so 151.8 cubic feet / 27 = 5.62 cubic yards in 460 square feet at 4 inches thick.
1 foot = 1/3 yard(440 x 1/3) = 146 and 2/3 cubic yards
You cannot directly convert cubic yards to square yards because they measure different things: volume vs. area. Cubic yards measure volume, while square yards measure area. To find how many square yards cover the same area as a cubic yard of gravel, you would need to know the thickness or depth of the gravel layer.
I assume you mean cubic yards (some of us are really rigorous about our units) 600 ftxft (1/3yards/ft)(1/3yards/ft) = 600 (1/9)yards2 = 66 2/3 yards2 4 inch (1/12 ft/inch) = 1/3 ft 1/3 ft (1/3)yard/ft = 1/9 yards 66.66666666 yards2 x 1/9 yards = 7.41 yards3
To convert square feet to cubic yards, you need to know the depth or height of the space in feet. Assuming a standard depth of 1 foot for calculation, you can use the formula: cubic yards = (square feet × depth) / 27. For 130,680 square feet at a depth of 1 foot, it would be 130,680 / 27, which equals approximately 4,843.33 cubic yards.
39.1116 cubic yards
22.2222 cubic yards (the 2s keep on going).
1 cubic yard = 27 cubic feet700 square feet x 1/2 foot = 350 cubic feet = 1226/27 cubic yards(12.963 cubic yards, rounded)
For a 4-inch thick slab, you will need at least 9.48 Cubic Yards.
996 square feet X 1/3 foot = 332 cubic feet.332 cft / 27 = 12.3 cubic yards
Slightly less than 26 cu. yards.
10.67 Cubic Yards
There is not enough information given to answer this question,I need to know a depth of the square footage fo convert to cubic yards. If this area is 1' thick it is slightly less than 80 cubic yards.
1000 square feet/9 = 111.1 square yards of concrete 6 inches thick. This is the same as 111.1/4.5 = 24.7 cubic yards of concrete.
At 4" thick you would need at least 7.04 cubic yards. At 6" thick you'll need at least 10.56 cubic yards. If the slab is 2" thick, you'll need 3.52cubic yards.
Apples and oranges. Without knowing how thick the 450 sq. ft. area is or how thick you want it to be you can't convert to cubic yards. A cubic yard has 27 cubic feet. One square foot 3 inches thick would be 1/4 cubic feet. 4 sq. ft. 3 inches thick would be 1 cubic foot. 450 sq. ft. 3 inches thick is 112 1/2 cubic feet or just a bit over 4 cubic yards. 450 sq. ft. 4 inches thick is 150 cubic feet or 5 1/2 cubic yards.
47.55 cubic yards . 4" would be 5.23 cubic yards.