27 cubic feet = 1 cubic yard.
The surface area of a cube = 6 x y2 ; y is the cube length For a 9 cubic yard concrete = 9 x 27 cubic feet = 243 cubic feet The cube side = (243)1/3 Accordingly the cube surface area = 6 x (243)2/3 square feet
5,184 cubic inches.
About 8.5556 cubic feet.
20 cubic feet is about 0.566 cubic meters.
About 1.244 cubic feet in one bushel.
there are 27 cubic feet in one cubic yard.
1 cubic yard is equal to 3*3*3, or 27 feet cubed. Therefore, 3 cubic yards would be 81 cubic feet.
0.2
3 feet in a meter Area of a cube = length^3 or 27 cubic feet
ONE I THINK, SINCE THERE ARE 27 CUBIC FEET IN A CUBIC YARD OF CONCRETE (WHICH MEASURES 3 FEET BY 3 FEET BY 3 FEET).
To determine how many cubic feet of concrete are needed, you first need to know the depth of the concrete slab. For example, if the slab is 6 inches thick, you would multiply 360 square feet by the thickness in feet (6 inches = 0.5 feet) to get 180 cubic feet of concrete required.
3