answersLogoWhite

0

The surface area of a cube = 6 x y2 ; y is the cube length

For a 9 cubic yard concrete = 9 x 27 cubic feet = 243 cubic feet

The cube side = (243)1/3

Accordingly the cube surface area = 6 x (243)2/3 square feet

User Avatar

Wiki User

11y ago

What else can I help you with?

Related Questions

How many square yards of concrete are in 1000 square feet with a 6 inch depth?

1000 square feet/9 = 111.1 square yards of concrete 6 inches thick. This is the same as 111.1/4.5 = 24.7 cubic yards of concrete.


How many square yards of concrete is needed for an area that is 1600 square feet at four inches deep?

You cannot "fill" a cubic measurement with a square measurement.I think you meant cubic yards.1 cubic yard = 27 cubic feet.Your concrete slab is 1600 x 4/12 cubic feet = 533.333333... cubic feet.533.333333... cubic feet / 27 = 19.753 cubic yards (rounded to third decimal).


How many yards of concrete needed for 576 square feet?

For 576 square feet at a depth of 4 inches, you will need 7.11 cubic yards.


How many yards of concrete will cover 700 square feet at 6 inches thick?

1 cubic yard = 27 cubic feet700 square feet x 1/2 foot = 350 cubic feet = 1226/27 cubic yards(12.963 cubic yards, rounded)


How many yards of concrete will be needed to fill in 400 square feet?

It depends upon how thick you want the concrete. For example, if you want the concrete to be 6 inches thick, then you will need 200 cubic feet. There are 27 cubic feet per cubic yard; so divide the 200 cubic feet by 27 to get 7.4 cubic yards.


Measuring square feet into yards of concrete?

1 cubic yard of concrete fills 27/depth in feet square feet.The number of cubic yards you need is(length of the pad in feet) x (width of the pad in feet) x (depth of the pad in inches)/324


How many yards of concrete will you need for 720 square feet?

720 square feet at the standard 4-inch depth requires 8.9 cubic yards.


How do you calculate the yards of concrete needed for 3570 square feet?

How thick? Gotta have thickness to calculate cubic yards.


How many yards of concrete will cover 3200 square feet at 4 inches thick?

39.1116 cubic yards


How many yards of concrete needed for 5000 square feet 8 inch deep?

123.44 cubic yards


How man yaerds of concrete is requires to poor an area of 10 square and 4 inches thick?

To calculate the volume of concrete needed, first convert the thickness from inches to feet: 4 inches is 1/3 feet. Then, multiply the area (10 square feet) by the thickness in feet: 10 square feet × (1/3 feet) = 10/3 cubic feet. To convert cubic feet to cubic yards, divide by 27 (since there are 27 cubic feet in a cubic yard): (10/3) ÷ 27 = 0.123 cubic yards. Thus, approximately 0.123 cubic yards of concrete is required.


How many yards of concrete will a 20 by 30 slab need?

To calculate the amount of concrete needed for a 20 by 30 slab, first determine the area in square feet: 20 feet × 30 feet = 600 square feet. If the slab is, for example, 4 inches thick, convert the thickness to feet (4 inches ÷ 12 inches/foot = 0.33 feet). The volume in cubic feet is then 600 square feet × 0.33 feet = 198 cubic feet. Finally, convert cubic feet to cubic yards by dividing by 27 (since there are 27 cubic feet in a cubic yard): 198 ÷ 27 ≈ 7.33 cubic yards of concrete needed.