It depends on how deep it is.
18 cubic yards or 487.5 cubic feet.
To calculate the volume of dirt needed to fill the area, you would need to know the depth of the area in yards. If the depth is 3 yards, then you would need 1800 yards of dirt (600 cubic yards รท 3 yards). If the depth is 1 yard, then you would need 600 yards of dirt.
To calculate the volume of the area, multiply the length, width, and height: 120 x 92 x 24 = 331,776 cubic inches. To convert cubic inches to cubic yards (since 1 cubic yard = 46,656 cubic inches), divide 331,776 by 46,656 to get approximately 7.1 cubic yards of dirt needed to fill the area.
53.33333333 cubic yards. I think. Wouldn't you divide your numbers by three to get yards and then multiply those answers together to get the area in cubic yards??
multiply the number of square yards - which is an area - by the average height in yards to get the volume in cubic yards
a cubic yard is 27 cubic ftyou have 5,000 cubic ft5,000 / 27 = 185.2 cubic yards
133.3 cubic feet
27 cubic feet = 1 cubic yardVolume = (14-ft x 14-ft x 1-ft) = 196 cubic feet = 7.26 cubic yards (rounded)
That's 13 cubic yards of mulch for every 2 inches deep.
6.7 cubic yards.
72 cubic yards
You cannot "fill" a cubic measurement with a square measurement.I think you meant cubic yards.1 cubic yard = 27 cubic feet.Your concrete slab is 1600 x 4/12 cubic feet = 533.333333... cubic feet.533.333333... cubic feet / 27 = 19.753 cubic yards (rounded to third decimal).