It will take 800 cubic yards 1/3 compaction.
To calculate the volume of the area, multiply the length, width, and height: 120 x 92 x 24 = 331,776 cubic inches. To convert cubic inches to cubic yards (since 1 cubic yard = 46,656 cubic inches), divide 331,776 by 46,656 to get approximately 7.1 cubic yards of dirt needed to fill the area.
A yard is 3x3x3 = 27 cubic feet, so 7 yards is 7x27=189 cubic feet
The volume of the hole is 2 yards * 3 yards * 1 yard = 6 cubic yards. To convert this to cubic feet, we multiply by 27 (since 1 cubic yard = 27 cubic feet). Therefore, the volume of the hole in cubic feet is 6 cubic yards * 27 cubic feet = 162 cubic feet of dirt.
Based on the category I am assuming we are takling dirt or mulch. 75 yds x 27 cuft (there is 27 cuft per 1 cuyd) = 2,025 cubic feet of material - 1 foot thick would be 2,025 sqft. - 6 inches thick would be 4,050 sqft. - 3 inches thick would be 8,100 sqft.
You find the square footage of the total area....40 X 60=2400 square feet. Then convert that to cubic yards by dividing by 27....(27 cubic feet per cubic yard) 2400 divided by 27= 85.1 cu. yards To raise the area by one foot, this would be the end of the calculation. If you were to only want to raise an area by 4 inches lets say....then you would multiply 85.1 by .33 or one third of a foot. (for 6 inches you would multiply by .50 or 1/2 foot) NOW, you have to take into account compaction or loss. When figuring concrete, allow up to 10%. When figuring dirt (depending on how sandy etc.) rule of thumb is to allow UP TO 1/3 for compaction. In your question above, allow for 1/3 and you would need another 28 yards (cu. yards). This would figure as 85.1 X.33 and would equal roughly another 28 yards. So, the total needed would be 85 cu. yds (85 rounded) PLUS 28 .....or a total of 113 cu. yards.
133.33 cubic yards, that's 400 feet
To calculate the volume of the area, multiply the length, width, and height: 120 x 92 x 24 = 331,776 cubic inches. To convert cubic inches to cubic yards (since 1 cubic yard = 46,656 cubic inches), divide 331,776 by 46,656 to get approximately 7.1 cubic yards of dirt needed to fill the area.
None. Just build the baseball field where the dirt is already there.
When a person speaks of a 'yard' of dirt, sand, cement or similar material, they actually mean a 'cubic yard'. A yard is a measurement of length. A cubic yard is a measurement of volume.60 (cubic) yards of dirt is the equivalent of 1,620 cubic feet of dirt.One cubic yard is measured as an amount that is 3 feet wide x 3 feet long x 3 feet high, or 27 cubic feet.60 cubic yards equals 27 cubic feet x 60, which equals 1,620 cubic feet.If you spread 60 cubic yards of dirt one foot thick you'd have an area of 1,620 square feet.If you spread this dirt 6 inches thick you'd have an area of 3,240 square feet.
14 cubic feet = 0.518 cubic yards
A yard is 3x3x3 = 27 cubic feet, so 7 yards is 7x27=189 cubic feet
To calculate the volume in cubic yards, first find the volume in cubic inches: (4 \times 8 \times 8 = 256) cubic inches. Next, convert cubic inches to cubic yards by dividing by 46,656 (since there are 46,656 cubic inches in one cubic yard). Thus, (256 \div 46,656 \approx 0.0055) cubic yards of dirt are needed to fill the area.
None because it's a hole but 6 cubic yards of dirt will fill it up.
This question cannot be answered. An area is "square", a volume is "cubic". The question asks about the volume of an area... and is meaningless. A square yard contains 9 square feet An area 30 feet by 50 feet contains 1,500 square feet or 166.67 square yards
There is about 2800lbs in 2 yards of top soil.
Sorry the first answer was in square yds. Cubic yards would be 0.308639
None. It's a hole. 162 cubic feet of air. There is no dirt in a hole.