Densities vary slightly, but with normal hardstone (high Polished Stone Value) aggregate 2.38 to 2.40 tonnes per cubic metre is the number you're looking for. This assumes voids content of between 4 - 8%, in other words, laid to Specification. Hope this helps:-) Bill Galer Reinstatement Contracts Manager, Wessex Water
Densities vary slightly, but with normal hardstone (high Polished Stone Value) aggregate 2.38 to 2.40 tonnes per cubic metre is the number you're looking for. This assumes voids content of between 4 - 8%, in other words, laid to Specification. Hope this helps:-) Bill Galer Reinstatement Contracts Manager, Wessex Water
1 cubic meter is 1.308 cubic yards.
1 meter = 10 decimeter 1 cubic meter = 1000 cubic decimeter
There are approximately 1.30795 cubic yards in a cubic meter.
No cubic decimeters are in a meter. There are 1000 cubic decimeters in 1 cubic meter.
0.001 cubic meter
1 cubic meter ≈ 35.3146667 cubic foot
1 cubic meter is 1,000 cubic decimeters.
1 (cubic meter) = 35.315 cubic feet.
Each cubic meter is about 35.3147 cubic feet.
one cubic meter is 35.3 cubic feet
1 million cubic centimeters per cubic meter.