The cost for a sawmill to have a contractor supply logs can vary significantly based on factors such as location, log quality, and market conditions, but it typically ranges from $50 to $150 per cubic meter. Additional costs may include transportation and handling fees. Ultimately, the specific price will depend on the contractual agreement between the sawmill and the contractor, as well as current supply and demand dynamics in the timber market.
1 meter = 10 decimeter 1 cubic meter = 1000 cubic decimeter
Kilogram per cubic meter is the one that doesn't belong. Square meter is meter^2 and cubic meter is meter^3 but kilogram per cubic meter is a density
There are approximately 1.30795 cubic yards in a cubic meter.
Gold.
The meter is a bit more than a yard, so a cubic meter will have a bit more than a cubic yard in it. The cubic meter is actually about 1.30795 cubic yards, so since we're just doing a "ball park" estimate, our guess that a cubic meter is about the same as a cubic yard is only off a bit. A cubic meter is about 1.3 cubic yards if you wish to get a bit more specific.
No cubic decimeters are in a meter. There are 1000 cubic decimeters in 1 cubic meter.
A cubic meter is larger.
one cubic meter is 35.3 cubic feet
Depends on what the cubic meter is made of. A cubic meter of air will be something entirely different from a cubic of water.
1 Cubic Meter is 35.3147 Cubic Feet. Remember, a meter is about 36 inches.
1 million cubic centimentres in a cubic meter.
1 cubic meter ≈ 35.3146667 cubic foot