200 hp requires about 149kW
No. Usually when you get to that size panels the grounds are stranded.
A 350 amp service is not a standard service distribution. It jumps from a 200 to a 400 amp rated distribution equipment. The only way to obtain a 350 size service is to install 400 amp equipment and fuse it at 350 amps. The standard size home distributions in North America today are rated at 200 amps. The cost of the service differs through out the continent. Ask your local electrical contractor for an estimate on an electrical upgrade to the required service that you want.
Depends on the size of the service. 100 amp service will require 3 gauge, 150 amp service will require 1/0 gauge, and 200 amp service will require 3/0 gauge.
AWG # 3/0 copper.
Service wire required is AWG # 3/0 copper.
200 hp requires about 149kW
Check the nameplate on the service panel. There it will tell you what the buss capacity is. On a 200 amp service nothing in the wiring configuration is allowed to be less than that the service rating. In the market there are 200 amp 42 circuit distribution panels.
Depends on local building codes and requirements. Many areas now require a 200 amp service (either by local code or power company requirements). In some areas the size of the structure will determine the minimum size of the service. One thing to keep in mind is that it is much less expensive to install a 200 amp service now than to install the same service later when walls will have to be broken into to add a larger service and panel.
Required numbers from 200 and 300 are 207,217,227,237,247,257,267,270,271,272,273,274,275,276,278,279,287,297 these are the numbers therefore, the answer is 18
The answer is 1.7*1028
7.64 days
Each hot leg to the neutral wire of the service has the ampacity of 200 amps, that is why 3/0 wire is required. A 3/0 copper wire with an insulation factor of 90 degrees C is rated at 210 amps.
About 40 panels, if the panel produces around 5a ea 5amp /200 =40. But don't expect it to be constant due to sun Ducking in and out of the clouds and cloudy and rainy days.
The number of circuits you can have on a 200 amp service depends on the load of each circuit. As a general rule of thumb, you can have up to 40-50 circuits on a 200 amp service panel, but this can vary based on the specific requirements of your electrical system and local codes. It's important to consult with a licensed electrician to determine the appropriate number of circuits for your installation.
40
200 molecules of water would be required to break down a protein with 200 peptide bonds. Each peptide bond is broken by a water molecule in a hydrolysis reaction, splitting the bond and releasing an amino acid.