Wiki User
∙ 10y ago#6 bare copper wire.
Wiki User
∙ 10y agoWiki User
∙ 10y ago#4 copper.
The NEC makes no provision for using 1 ground rod even on a temporary service. According to the NEC you must use 2 ground rods. However in my area we are allowed by the local inspector to use just 1. Call your local inspector and see what he requires as he has the last word on this.
Hot, neutral and ground.
A #6 copper ground conductor would be needed.
As long as the clamp is of an approved type only one is needed per ground rod.
For service sizes of 100 amps and less a #8 bare copper conductor is required.
200 amp service in chicago uses 3 aught.
No, But it is recommended
The NEC makes no provision for using 1 ground rod even on a temporary service. According to the NEC you must use 2 ground rods. However in my area we are allowed by the local inspector to use just 1. Call your local inspector and see what he requires as he has the last word on this.
To prepone air tickets one must contact customer service to request their needed service. They must also include why this service is needed and when it is needed.
Vinny says to tell the short man in the hat to deliver the items needed in New Jersey. This task is of the utmost importance and should be attended to immediately.
Because they needed money
The required size of the service grounding conductor for a 350 amp parallel service will depend on the specific installation requirements and local codes. It is recommended to consult with a licensed electrician or engineer to determine the proper size based on factors such as the type of wiring used, the distance between the service entrance and the transformer, and the local ground conditions.
If your service is needed, get sponsored by the company man you do your service for.
from the ground i guess.
is there free dental service in the tidewater area needed pulling and dentures
Check your owners maintenance manual. The same goes for B service
what service kit is needed to service a 2006 citi golf that has 100000 km on the clock