The height of the pole is 19.62ft
66
Defining the height of a pyramid is by taking a straight line from its base at ground level to its highest point.
Assuming the ground is flat and level. The pole, ground and cable would form a right triangle. Using Pythagorean's theorem: a2+b2=c2 x2+402=502 x2=2500-1600 = 900 x = √900 = 30 feet. The pole is 30 feet tall.
False
base
66
66
The diagram is a right-angle triangle with a ht of 115m and a base of 24m.
Answer for USA, Canada and countries running a 60 Hertz supply service.It is understandable because the utility company is not compelled to do so. It is the utility company's domain up to the meter base in an underground service drop and the customers responsibility from the meter base on into the distribution panel. The service distribution ground is originated at the distribution and from it a ground wire is run outside to a driven ground rod or to buried ground plate.
Ground BASS** (not base) was largely a Baroque affect, although, life many other Baroque affects, has had, at some point, a comeback. Henry Purcell was a notable ground bass composer.
This shape is a right triangle, who's equation is: c2=a2+b2 In this example, c is decribed by the 50ft cable and either a or b is described by the 15 ft anchor point. So the equation becomes: 502=152+b2. Solve for b, you get sqrt(2275) which is approx 47.7 ft
The cable makes a right triangle with the ground and the tower. You'd be using the Pythagorean theorem (a2+b2=c2) c is the cable (200') and use 80' as either a or b.a2+802=2002a2=2002-802a2=40000-6400a2=33600a=183.3' rounded
Defining the height of a pyramid is by taking a straight line from its base at ground level to its highest point.
Start by removing the ground cable first(negative). Then remove the positive cable. At the base of the battery is a hold down clamp, held in by one bolt. Remove this and the battery will lift right out.
1). Utility depends upon wants. 2). Utility depends upon use. 3). Uility depends upon time and place. 4). Uility is different from usefulness. 5). Utility is base of demand.
yes, that is if you' re running windows XP & below.
The point of connection will be at the utility meter base, Whether the service is installed from a pole (overhead) or underground. In an overhead installation, the conductors may physically attach to the house at points other than the meter base, but they will always end up at the meter base.