Well, darling, to convert cost per square meter to cost per lineal meter, you need to know the width of the material. Once you have that, simply divide the cost per square meter by the width in meters to get the cost per lineal meter. It's as easy as pie, honey. Just remember, math doesn't have to be boring!
To convert cost per square meter to cost per lineal meter, you need to consider the dimensions involved. The cost per square meter represents the cost of a two-dimensional area, while the cost per lineal meter represents the cost of a one-dimensional length. To make this conversion, you would need to know the width of the material in meters. Then, you can divide the cost per square meter by the width to get the cost per lineal meter.
per square foot titanium cost on avg. $215
42.46 per square yard.
120 dollars
how much to caulk floor joints per linear feet
what is the cost of a roof per square foot
You cannot - you need information about the width.
0, because a lineal meter has an area of 0
Often yes. Particularly if it is fabric, carpet or other floor covering. But, to be safe, check that the given price is not for a square metre.
Multiply by 1.19599
To convert square yards to square meters, multiply by 0.8361. Therefore, a square meter of carpet would cost approximately $11.91 (9.99/0.8361).
Linear metres and metres are the same measurement. The word linear is simply used to distinguish it from square metres or cubic metres. Therefore, the two are the same value.
Cost of 1 square meter: 1,150,000/15,013 = 76.60027976 or 77 rounded
Cow grass can cost between $1.90 and $7.00 per square meter. Many places will only allow orders by 100 square meter or 1000 square meter increments.
The term lineal meter is used to describe the nominal length of an item. For example carpet maybe produced on a loom perhaps 4m wide. A lineal meter of carpet would be 1m long x 4m wide. Thus 4 lineal meters of this particular carpet would cover 16 square meters. In a similar fashion timber is often sold by the lineal meter which describes the cost per meter of length of the board. The board would have a width and if you were to the purchase timber to build a deck you would need to calculate the number of lengths of boards to cover the area of deck having taken into account the width of the board. When ordering you would ask for X lineal meters of the particular board. Obviously its important to know the particular specifications of the material you intend to use. For example not all carpet is produced on a 4m loom and so it is important to understand the effect of substituting different materials so that a material shortage or wastage does not occur.
5
That would depend what information you are given. The cost of floor tiling is often already expressed per square meter. If you know the total cost of a certain floor, you can divide by the area to get the cost per square meter.
per square foot titanium cost on avg. $215