answersLogoWhite

0


Best Answer

Simple 3x14=42cubic inches so at a rate of 9cubic inches per minute.

42ci/9ci/m=4.7m

then you multiply 4.7 by 60 to convert to seconds as it is the standard form for most physics.

4.7x60=282s

so it would take 282 seconds to fill the cylinder

User Avatar

Wiki User

15y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: Water is poured into a cylindrical tank at the rate of 9 cubic inches a minute. How long will it take to fill the tank if its radius is 3 inches and it height is 14 inches?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Continue Learning about Geometry

Rainfall on a flat rectangular roof 10m by 5.5m flows into a cylindrical tub of a diameter 3m find in cm the increase in depth of the water in the tub caused by a rainfall of 1.2 cm help please?

This is a clever problem. It sounds really complicated, but that's only becauseit's actually two simple problems rolled into one.The two problems are:1). Volume of a rectangular prism2). Volume of a cylinderBefore we get started, let's make sure you remember the formulas for both ofthose volumes:1). Rectangular prism . . . V = (length) x (width) x (height)2). Cylinder . . . Volume = (pi) x (radius)2 x (height)The attack is:-- Figure out the volume of the water that rained onto the roof.-- Realize that the same volume poured into the cylindrical tub.-- Figure out how deep that much water fills the cylinder.At this point, the hard part is done! The problem is as good as solved.-- 1.2 cm of rain falls on the 10m x 5.5m rectangular roof. How much water is sitting on the roof ?Volume = L x W x H = (10m) x (5.5m) x (0.012 m) = 0.66 cubic meter of water-- Now pour that water into the cylinder with 3m diameter. How deep is it ?Volume = (pi) x (radius)2 x (height) .We need to find the height, so solve this formula for the height.Divide each side of equation by (pi) x (radius)2 :Height = Volume / (pi) x (radius)2The volume is the 0.66 m3 that poured off of the roof.The radius is 1/2 of the diameter = 1.5m .So Height = (0.66)/(pi) x (1.5)2 = 0.09337 meter = 9.337 cm.


How much does a retaining wall cost per foot?

It all depends on the height, materials used and the length. If you can let me know what you'd like to use (i.e. retaining wall modular block, chopped stone, poured-in-place concrete) I can probably give you a pretty good idea.


A cylinder has a radius of 3 cm and sand is poured into the cylinder to form a layer 1 cm deep . What is the volume of sand in the cylinder?

The volume of a cylinder is V=PI*r2*h The radius of the cylinder is 3 cm and the height would be 1cm So V = PI*(3cm)2*(1cm) V is approx. 28.3 cm3


A cylinder has a radius of 3cm sand is poured into the cylinder to form a layer 1 cm deep what is the volume of sand in the cylinder?

Assuming the radius is an inside dimension: The inner surface area of the cylinder is Pi x R² = 3.1416 x (3 x 3) = 3.1416 x 9 = 28.2744 sq cm. The area is multiplied by the depth of the sand to find its volume. 28.2744 sq cm x 1 cm = 28.2744 cu cm.


How soon can i tile over new concrete?

It is advisable to wait a minimum of 28 days before tiling over newly poured concrete. This is because concrete needs time to cure and dry, allowing it to reach its full strength and prevent the tiles from cracking or coming loose over time. Once the waiting period has passed, the concrete surface should be thoroughly cleaned to remove any debris, and a primer or bonding agent may be necessary to ensure proper adhesion of the tiles. Following manufacturer instructions and consulting with a professional can help ensure a successful installation.

Related questions

What is the height of this quantity of water if it is poured into a cylindrical container of radius 2?

The height of this quantity of water would be exactly that much!


What is the diameter if you pour 3392.92 of liquid into 30 cups?

The question cannot be answered. Is it about the diameter of the container from which the liquid is poured or of the cups? Is the shape cylindrical (and if so, how tall?) or is it spherical?


Can a fresh poured concrete retaining wall with air pockets 3 inches deep 5 feet long be salvaged?

Consult a structural engineer. The height, width, depth, and load of the wall, along with the location of the pockets, will need to be provided to determine its suitability in providing the intended utility.


How many yards of concrete is 400 square ft?

At a poured depth of 4 inches, you will need 4.94 cubic yards.


Is Poured is a common Poured Is A Common Noun?

common poured


How thick is a typical poured concrete basement wall?

Almost all that I've seen in regular house construction are 8 inches thick.


What is the frost depth for Maryland?

Frost line here in Maryland is 24 inches. Foundations are normally dug to 30" where the footings are poured.


How square feet in one yard of concrete?

It is impossible to answer the question as asked because square feet is a measure of area and a "yard of concrete" actually refers to a cubic yard of concrete. However, if we make a couple assumptions we can answer the question I THINK you're asking which is, "How many square feet of concrete does one cubic yard of concrete yield if poured to a typical depth of 4 inches?" The inches of depth can be changed to suit the situation, but in any case giving the poured concrete a depth turns it into a volume which makes it easier to compute the area a cubic yard of concrete will cover. To begin, we need to convertt the square footage of concrete (which is an area) to a volume. Let's use 6 inches for the depth: 12" x 12" x 6" = 864in^3 or 864 cubic inches This is the number of cubic inches of concrete in one square foot of concrete poured to a depth of 6 inches. Now we put a cubic yard into the same terms, cubic inches: 36" x 36" x 36" = 46,656 in^3 or 46,656 cubic inches of concrete. Now we simply divide number of cubic inches of concrete in a yard of concrete by the number of cubic inches in a square foot of concrete poured to a depth of 6 inches: 46656 / 864 = 54 square feet. By the way, there are 27 cubic feet in a cubic yard and you may notice that 27 x 2 = 54. That's a result of the depth I chose for the poured concrete--6 inches. A square foot of concrete poured to a depth of 6 inches is equal to one half cubic foot of concrete. 27 / .5 = 54 If you want to figure square foot yield per yard when you pour the slab at 4 inches instead of 6 inches, then simply substitute 4" in the equations for 6". (36" x 36" x 36") / (12" x 12" x 4") = 81 square feet.


What is the homophone for pored?

The homophone for "pored" is "poured."


How many cubic centimeters of liquid can be poured into a rectangular baking pan that is 45 cm by 20 cm?

Without knowing the height of the pan, the pan's volume can't be calculated.


Can plasma be poured?

actually a gas can be contained in a container, basicly being poured, so plasma can be poured. YES


What part of speech is poured?

Poured is a verb. It's the past tense of pour.