answer-140 sq yds
.617 Yards
259.2593 sq. yards.
6 inches = 1/6 yards. So 70 sq yards * 6 inches = 70*1/6 cubic yards = 11.66... cubic yards.
tweleve
One cubic yard covers 81 square feet 4 inches thick.
40.1 cubic yards
To find the volume of gravel in cubic yards, first convert the depth to yards: 2 inches is 1/6 yard. Then, multiply the dimensions to get the volume in cubic yards: 5 yards wide x 28 yards long x 1/6 yard deep = 23 1/3 cubic yards. Since 1 cubic yard is equal to 1,296 square inches, multiply the volume by 1,296 to convert to square inches: 23 1/3 cubic yards x 1,296 = 30,158.22 square inches. Finally, divide by 9 to convert square inches to square yards: 30,158.22 square inches / 9 = approximately 3,350.91 square yards of gravel.
.617 Yards
259.2593 sq. yards.
6 inches = 1/6 yards. So 70 sq yards * 6 inches = 70*1/6 cubic yards = 11.66... cubic yards.
To calculate how many square yards (SY) of concrete one cubic yard (CY) will cover, first determine the volume of the sidewalk. The sidewalk dimensions are 40 feet wide and 4 inches deep. Converting these measurements, we find that 40 feet equals 13.33 yards, and 4 inches equals approximately 0.11 yards. The volume of the sidewalk is 13.33 yards * 0.11 yards = 1.47 cubic yards. Therefore, 1 cubic yard of concrete will cover approximately 0.68 square yards (1 CY / 1.47 CY).
tweleve
1 cubic yard will cover 15 square yards at 3 inches deep.
One cubic yard covers 81 square feet 4 inches thick.
It depends on how deep it is. If it is 6 inches deep, you will need 77 yards.
4860 sq feet
2.2222222201902215 cubic yards