0.25 = 1/4
1 hour = 60 minutes
1/4 hour = 15 minutes
1 and 1/4 hour = 75 minutes
To find 75% of an hour, you first convert the percentage to a decimal by dividing by 100, so 75% becomes 0.75. Then, you multiply 0.75 by the total number of minutes in an hour, which is 60. Therefore, 75% of an hour is 45 minutes.
There are 60 minutes in 1 hour. Plus 15 minutes in one fourth hour. Adding them together makes 75 minutes.
an hour and 15 minutes or an hour and 1/4 minutes
75 minutes
15 minutes = 1/4 hour so 125 mph for 1/4 hour = 125/4 miles = 31.25 miles.
125 Kilometres - 75 minutes is 1.25 hours.
No, 125 minutes is 2 1/12 hours. 60 minutes is an hour.
1 hour 40 minutes.
If you mean .75 of an hour then it is 45 minutes
There are 60 minutes in one hour. Therefore, 75 percent of one hour is equal to 75/100 x 60 = 45 minutes.
To find 75% of an hour, you first convert the percentage to a decimal by dividing by 100, so 75% becomes 0.75. Then, you multiply 0.75 by the total number of minutes in an hour, which is 60. Therefore, 75% of an hour is 45 minutes.
There are 60 minutes in 1 hour. Plus 15 minutes in one fourth hour. Adding them together makes 75 minutes.
an hour and 15 minutes or an hour and 1/4 minutes
75 minutes
1 hour (60 minutes) + 65 minutes = 125 minutes
It is 125 minutes, which equals 2 hours and 5 minutes
75 = 60 + 15 1 hour 15 minutes