You go upto the machine and shake once then say aye corumba then it shall work hope that helped since it always works with me!
Miles per hour or kilometers per hour
1 miles per hour = 1 609.344 meters per hour
Metres per second * 2.2369 = miles per hour.
The average labor cost per hour in Chile will be 19$
Total comp cost = wage per hour + benefit and pension cost per hour + employer Social Security cost per hour + unemployment tax per hour + worker comp tax per hour.
The machine hour rate is calculated on the total investment made to run the machine. This includes the cost of accessories, tools , fixtures,inspection equipments etc. First the interest, installment for repayment of loan and depriciation is calculated and it is worked out to per working hour cost. After this variable cost is worked out that is direct and indirect labour cost, consumable cost, power,maintainance,space cost of machine and inventory, interest on appropriate working capital employed, etc. this again worked out to per working hour. Then general costs are applied such as overheads, general admn. cost, waste and scrap and profit. The work hours can be calculated and appropriate efficiency can be applied. N.B.Sawant
The contribution per machine hour is the contribution per unit divided by the number of machine hours per unit.
Contribution margin for per machine hour is as follows:total contribution margin / number of machine hours = contribution margin per hour
To calculate the per unit cost of electricity in terms of kilowatt-hour, divide the total cost of electricity by the total number of kilowatt-hours consumed during a specific time period. This will give you the cost per kilowatt-hour.
You go upto the machine and shake once then say aye corumba then it shall work hope that helped since it always works with me!
Weaver Company's predetermined overhead rate is $18.00 per direct labor-hour and its direct labor wage rate is $12.00 per hour.
To use the high-low method, you would first identify the highest and lowest level of machine hours and their corresponding total overhead costs from January to June. Then, calculate the variable cost per machine hour by subtracting the total overhead cost at the lowest level from that at the highest level, and dividing by the difference in machine hours between the two levels. Finally, use this variable cost per machine hour to estimate total overhead costs at any level of machine hours by multiplying it with the number of machine hours used.
To calculate the electricity bill for a house per month, multiply the total kilowatt-hours used by the cost per kilowatt-hour. The total kilowatt-hours used can be found on your electricity bill or by monitoring your meter. The cost per kilowatt-hour is provided by your utility company.
Labor cost per square foot to wire a house may vary depending on your contractors rates. They will usually have a rate per hour. You can multiple the hourly rate by the square footage needed per hour.
Calculate the machine hour rate from the following: Rs. Rs. Cost of machine 8,000 Shop supervisor salary 200p.m Cost of installation 2,000 Insurance premium for amachine 60 p.a Scrap value after 10 years 2,000 Estimated repair 100p.a Rent and rates for sho 100 p.m Power 2 units per hour @Rs. 5 per 100 units. General lighting 20p.m Estimated working hours 2,000 p.a
Miles per hour or kilometers per hour