Start with a conversion factor. An "old timer's" view is that a cubic foot of dry sand weighs about 125 pounds. There are 3 feet in a yard. There are 3 x 3 or 9 square feet in a square yard. There are 3 x 3 x 3 or 27 cubic feet in a cubic yard. As there are 27 cubic feet in a cubic yard and there are 125 pounds to a cubic foot of our dry sand, there are 27 x 125 pounds of dry sand per cubic yard, or 3,375 pounds of dry sand per cubic yard. (Yes, there are that many.) There are 2,240 pounds in an Imperial ton. There are 3,375 divided by 2,240 Imperial tons in a cubic yard of dry sand, or right at 1.5 Imperial tons of dry sand per cubic yard. To convert cubic yards of dry sand to Imperial tons, multiply the number of cubic yards of dry sand by 1.5 and your answer will appear. Every time.

User Avatar

Wiki User

17y ago

What else can I help you with?

Continue Learning about Math & Arithmetic

How to Convert cubic yards to cubic centimeters?

A yard is 91.44 cm One cubic yard is 91.44x91.44x91.44=764554.857984 cubic cm, or .765 cubic meters. Concrete and sand are often measured in cubic yards. In metric countries it is measured in cubic meters. Roughly there are 1.3 cubic yards in a cubic meter.


How many yards of sand to cover 20 foot circle 2 inches thick?

To find the amount of sand needed, first convert the thickness from inches to feet: 2 inches is 1/6 of a foot. The area of a 20-foot circle is calculated using the formula (A = \pi r^2), where the radius (r) is 10 feet. This gives an area of approximately 314.16 square feet. To find the volume of sand required, multiply the area by the thickness: (314.16 \times \frac{1}{6} \approx 52.36) cubic feet. Finally, convert cubic feet to cubic yards (1 cubic yard = 27 cubic feet), resulting in about 1.94 cubic yards of sand needed.


How many yards of sand to cover a 60 foot round pen with 3 inches of sand?

To calculate the amount of sand needed, first convert the dimensions to yards. A 60-foot round pen has a radius of 30 feet, which is 10 yards. The area of the circle is πr², so the area is approximately 314.16 square feet. To cover it with 3 inches (0.25 feet) of sand, multiply the area by the depth: 314.16 sq ft x 0.25 ft = about 78.54 cubic feet. Since there are 27 cubic feet in a cubic yard, divide by 27 to get approximately 2.91 cubic yards of sand needed.


How much sand is need to cover 7500 sq ft 4 deep?

To cover 7,500 square feet to a depth of 4 inches, you first convert the depth to feet, which is 4 inches ÷ 12 inches/foot = 0.33 feet. Then, multiply the area by the depth: 7,500 sq ft × 0.33 ft = 2,475 cubic feet of sand. If you need the amount in cubic yards, divide by 27 (since there are 27 cubic feet in a cubic yard), resulting in approximately 91.67 cubic yards of sand.


How much sand shingle cement do you need for a concrete pad 16 foot by 12 foot x 4inc thick?

To calculate the amount of materials needed for a concrete pad measuring 16 feet by 12 feet and 4 inches thick, first convert the thickness to feet: 4 inches is approximately 0.33 feet. The volume of the pad is 16 ft × 12 ft × 0.33 ft = 63.84 cubic feet. Generally, a cubic yard of concrete requires about 1 part cement, 2 parts sand, and 3 parts gravel. For this volume, you'll need approximately 2.36 cubic yards of concrete, which translates to about 0.39 cubic yards of cement, 0.78 cubic yards of sand, and 1.17 cubic yards of gravel.

Related Questions

Convert 9800 cubic yards of sand to tons?

To convert cubic yards of sand to tons, you can use the following formula: 1 cubic yard of sand is approximately equal to 1.35 tons. Therefore, 9800 cubic yards of sand would be approximately equal to 9800 * 1.35 = 13230 tons.


Convert 827 ton sand to cubic yards?

it's over 9000


How to Convert cubic yards to cubic centimeters?

A yard is 91.44 cm One cubic yard is 91.44x91.44x91.44=764554.857984 cubic cm, or .765 cubic meters. Concrete and sand are often measured in cubic yards. In metric countries it is measured in cubic meters. Roughly there are 1.3 cubic yards in a cubic meter.


How many yards of sand to fill a 275 gallon oil tank?

To determine how many yards of sand are needed to fill a 275-gallon oil tank, first, convert gallons to cubic yards. There are 27 cubic feet in a cubic yard and 7.48 gallons in a cubic foot. Thus, 275 gallons is approximately 37 cubic feet (275 ÷ 7.48). Dividing by 27 yields about 1.37 cubic yards. Therefore, you would need approximately 1.37 yards of sand to fill a 275-gallon oil tank.


How many yards of sand needed to cover 5000 sq feet 1 inch deep?

To calculate the amount of sand needed, first convert the depth from inches to feet. Since 1 inch is 1/12 of a foot, 1 inch deep over 5000 square feet equals 5000 sq ft × (1/12 ft) = 416.67 cubic feet. To convert cubic feet to cubic yards, divide by 27 (since there are 27 cubic feet in a cubic yard): 416.67 cubic feet ÷ 27 = approximately 15.43 cubic yards. Therefore, you would need about 15.43 yards of sand to cover 5000 square feet to a depth of 1 inch.


How many yards of sand to cover 20 foot circle 2 inches thick?

To find the amount of sand needed, first convert the thickness from inches to feet: 2 inches is 1/6 of a foot. The area of a 20-foot circle is calculated using the formula (A = \pi r^2), where the radius (r) is 10 feet. This gives an area of approximately 314.16 square feet. To find the volume of sand required, multiply the area by the thickness: (314.16 \times \frac{1}{6} \approx 52.36) cubic feet. Finally, convert cubic feet to cubic yards (1 cubic yard = 27 cubic feet), resulting in about 1.94 cubic yards of sand needed.


How many yards of sand to cover a 60 foot round pen with 3 inches of sand?

To calculate the amount of sand needed, first convert the dimensions to yards. A 60-foot round pen has a radius of 30 feet, which is 10 yards. The area of the circle is πr², so the area is approximately 314.16 square feet. To cover it with 3 inches (0.25 feet) of sand, multiply the area by the depth: 314.16 sq ft x 0.25 ft = about 78.54 cubic feet. Since there are 27 cubic feet in a cubic yard, divide by 27 to get approximately 2.91 cubic yards of sand needed.


How many cubic yards is 4 yards?

Clean quartz sand weighs 80-125 pounds per cubic foot depending on degree of compaction and moisture content. A cubic yard is made up from 27 cubic feet. So taking a value of about 100 pounds of sand per cubic foot, 1 cubic yards of sand would weigh 2700 pounds or 1.35 ton [short, US]. Thus 4/1.35 = 2.963 So 4 short, US tons of sand would occupy a volume of 2.963 cubic yards.


How much sand is in a sand box?

To find out how much sand to put into a sand box, or how much sand is in a sand box, measure length x width x height to get a cubic volume number. Lets say you have a sand box that measures, 41 inches by 64 inches, with 12 inches deep of sand, (The child likes to dig!!) you would have yourself there, 31,488 cubic inches of sand. However, you want to know what the volume is in cubic yards. Well then, divide 31,488 cubic inches by 46,656 cubic inches per yard, and you get, some number like, 0.6748971193 cubic yards. Lets just call it 0.70 cubic yards of sand.


How many cubic feet of sand are in 4 cubic yards if 1 cubic yard equals 27 cubic feet?

If 1 cubic yard = 27 cubic feet, then 4 cubic yards = 108 cubic feet.


What if your customer has ordered 67 cubic yards of sand. The inside dimensions of your trailer are 40 feet long by 7 feet wide by 9 feet high. How high must the trailer be filled with sand (Round up?

To determine how high the trailer must be filled with sand, first, convert the trailer's dimensions to cubic yards. The trailer's volume is 40 ft × 7 ft × 9 ft = 2,520 cubic feet. Since there are 27 cubic feet in a cubic yard, the trailer can hold approximately 93.33 cubic yards of sand. To find the height for 67 cubic yards, divide 67 by the trailer's footprint (40 ft × 7 ft = 280 sq ft), which gives about 0.239 ft, or approximately 2.87 inches. Rounding up, the trailer must be filled to about 3 inches high with sand.


How much sand is need to cover 7500 sq ft 4 deep?

To cover 7,500 square feet to a depth of 4 inches, you first convert the depth to feet, which is 4 inches ÷ 12 inches/foot = 0.33 feet. Then, multiply the area by the depth: 7,500 sq ft × 0.33 ft = 2,475 cubic feet of sand. If you need the amount in cubic yards, divide by 27 (since there are 27 cubic feet in a cubic yard), resulting in approximately 91.67 cubic yards of sand.