Kilogram per cubic meter is the one that doesn't belong. Square meter is meter^2 and cubic meter is meter^3 but kilogram per cubic meter is a density
No cubic decimeters are in a meter. There are 1000 cubic decimeters in 1 cubic meter.
one cubic meter is 35.3 cubic feet
1 million cubic centimentres in a cubic meter.
You calculate the total cost of 1 cubic meter reinforcement cement for heavy foundation work by adding all of the costs. Essentially you would have to figure out the total of pounds of concrete for 1 cubic meter multiply that by the cost per pound and then add in the cost of labor it takes to pour 1 cubic meter.
One cubic meter is equivalent to 35.23 cubic feet, or one cubic meter is equivalent to 1.35 cubic yards.
32
1:6 brick work sand consumption for 1 cubic meter = 9.71 cft 1 cubic meter brick work cement consumption = 1.32 bags 1.32/28.8= .0458 cubic meter .458*6 = .275 .275*35.31 =9.71 cft
By a 'kilo' I assume you mean a kilogram, but this is a weight. A cubic meter is a volume. You can't compare them. You have to specify what the material is, to know the volume of a 'kilo', before you can work out how many in a cubic meter
1 meter = 10 decimeter 1 cubic meter = 1000 cubic decimeter
Kilogram per cubic meter is the one that doesn't belong. Square meter is meter^2 and cubic meter is meter^3 but kilogram per cubic meter is a density
There are approximately 1.30795 cubic yards in a cubic meter.
Gold.
The meter is a bit more than a yard, so a cubic meter will have a bit more than a cubic yard in it. The cubic meter is actually about 1.30795 cubic yards, so since we're just doing a "ball park" estimate, our guess that a cubic meter is about the same as a cubic yard is only off a bit. A cubic meter is about 1.3 cubic yards if you wish to get a bit more specific.
No cubic decimeters are in a meter. There are 1000 cubic decimeters in 1 cubic meter.
A cubic meter is larger.
one cubic meter is 35.3 cubic feet