It depends on the type/speed of the train, please be more precise with your question.
2 mintes
4 minutes. The last car on the train is the best way to think about it. That car has to travel the length of the train(1 mile) and also the length of the tunnel( also 1 mile). The total distance would be 2 miles, obviously. So if the train were traveling at 60mph it takes 1 minute to go 1 mile, but since it is going 30mph, it would take two minutes to go 1 mile.
From the time the front of the locomotive enters the tunnel . . .-- The front of the locomotive traverses the 1-mile tunnel, bringing the center of the train to the entrance.-- The center of the train traverses the 1-mile tunnel, bringing the end of the train to the entrance.-- The end of the train traverses the 1-mile tunnel.In all, the train has to travel 3 miles. At the rate of 12 mph, it takes (3/12) = 1/4 hour = 15 minutes.
If you are timing from when the train first enters the tunnel until the last car exits the tunnel, then the train would travel 2 miles during this time.So 2 mi / (15 mi/hr) = (2/15) hr * 60 (min/hr) = 8 minutes
It depends on the type/speed of the train, please be more precise with your question.
2 hours. If the train is one mile long and going 1 mile per hour through a mile long tunnel, in one hour the train would be completely inside the tunnel, since they are the same length and the train is only going one full tunnel length(mile) per hour. It would then take another whole hour for the end of the train to leave the tunnel, bringing the train completely out of the tunnel.
for minutes and 1 sec.
By train, it will take 8 hrs 20 minutes.
4 minutes
Well, isn't that a lovely little puzzle! If the train is 1 mile long and it's traveling at 1 mile per minute, it will take a total of 2 minutes for the train to completely pass through the 1-mile tunnel. Just imagine the train chugging along steadily, enjoying the journey through the tunnel, and coming out the other side with a happy little toot of its whistle.
1 day
2 mintes
The Napa Valley Wine train ride can take anywhere from 1.5 to 3 hours depending on location, distance, weather, occupancy, speed and train conditions.
5 min
4 minutes. The last car on the train is the best way to think about it. That car has to travel the length of the train(1 mile) and also the length of the tunnel( also 1 mile). The total distance would be 2 miles, obviously. So if the train were traveling at 60mph it takes 1 minute to go 1 mile, but since it is going 30mph, it would take two minutes to go 1 mile.
The train ride from Frankfurt, Germany to Dresden, Germany will take about 5 hours if it is an express. If it is not an express it will take about 7 hours.