answersLogoWhite

0

3.4 cm per year

User Avatar

Wiki User

13y ago

What else can I help you with?

Related Questions

How many years would the plate under the Pacific ocean take to move 36 inches?

The Pacific Plate moves at an average rate of about 2.75 inches per year. Therefore, to move 36 inches, it would take approximately 13 years.


How long does it take for the pacific plate to move one kilometer?

3.4 centimeters per year, so multiply that by one mile or one kilometer (0.6 of a mile)


How long will it take for the Pacific plate to travel 4.5 meters?

The Pacific plate moves at an average rate of about 7 to 11 centimeters per year. If we take an average rate of 10 centimeters per year, it would take approximately 0.45 years, or about 5.4 months, for the Pacific plate to travel 4.5 meters. However, the exact time can vary based on the specific rate of movement at different locations along the plate boundary.


In California the pacific plate slides past the North American plate. If the pacific plate is moving at a speed of 5 centimeters per year how long will it take for the plate to travel 100 meters?

There are 100 centimeters in a meter. Thus 100 meters is 10000 centimeters 10000 divided by 5 centimeters per year = Two Thousand Years


How long does it take a styrofoam plate to decompos?

TOO long, that is why you should use paper or re-use a glass plate


How long does it take to sail from the Atlantic ocean to the pacific ocean?

That depends entirely on where in the Pacific to where in the Atlantic.


How long did it take balboa to sail the pacific?

4 weeks


How long does it take plate tectonic to move?

Plate tectonics move about 2 centimeters every year. This is a very small amount of movement. Predicted in 2,000,000 years there will me another major difference in the formation of the continents


How long does it take to move into a house?

month


How long did it take Lewis and clark to reach the pacific ocean?

18 months


How long dose it to get to the Pacific Ocean to Seattle?

Driving it will take 130 miles


How long do it take to get a personalized license plate?

2 months